Suvarna Garge (Editor)

Trans Europa Naturgas Pipeline

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Germany

From
  
No. of compressor stations
  
4

Construction started
  
1972

Type of business
  
Passes throughs
  
General direction
  
north–south

Partners
  
EniE.ON

Diameter
  
950 mm (37 in)

Length
  
968 km (601 mi)

Commissioned
  
1974

Trans Europa Naturgas Pipeline httpss32postimgorgc3vqsfcpxTENPLeitungBoc

Operator
  
Trans Europa Naturgas Pipeline GmbH & Co. KG

Maximum discharge
  
15.5 billion cubic meters per year

The Trans Europa Naturgas Pipeline (TENP) is a natural gas pipeline which runs from the German-Netherlands border to the German-Swiss border. It carries North Sea natural gas from the Netherlands to Italy and Switzerland. It also provides natural gas for North Rhine-Westphalia, Rhineland-Palatinate and Baden-Württemberg federal states.

Contents

History

The TENP was built in 1972–1974, and upgraded in 1978 and 2009.

Route

The pipeline runs from the German-Netherlands border near Aachen to the German-Swiss border near Schwörstadt. In the German-Swiss border it is connected with the Transitgas Pipeline. En route, in Stolberg the pipeline is connected with the pipeline from Zeebrugge and in Mittelbrunn it is connected with the transport system of the MEGAL pipeline system which transports Russian natural gas from the German-Czech border to German regions and France.

Technical features

The length of the pipeline is 968 kilometres (601 mi) and it runs in two lines. It has a capacity of 15.5 billion cubic meters per year which the operator intends to increase by 2 billion cubic meters per year. The diameter of pipeline varies from 900 to 950 millimetres (35 to 37 in). The pipeline comprises four compressor stations.

Company

The pipeline is owned and operated by Trans Europa Naturgas Pipeline GmbH & Co. KG, a joint venture of Open Grid Europe (51%) and Fluxys (49%).

Antitrust case

Since 2007, the European Commission has been probing Eni's alleged restrictive practices on the TAG, Transitgas and TENP pipelines by limiting third parties access to the pipelines. The hearing is set for 27 November 2007.

References

Trans Europa Naturgas Pipeline Wikipedia