Thorntonbank Wind Farm

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Belgium

Commission date
  
18 September 2013

Max. water depth
  
27 m

Construction cost
  
1.3 billion EUR

Status
  
Operational

Type
  
Off-shore

Construction began
  
February 2008

Units operational
  
54

Thorntonbank Wind Farm Thornton Offshore Wind

Location
  
28 km north off the Belgian coast

The Thorntonbank Wind Farm is an offshore wind farm, 30 km (19 mi) off the Belgian coast, in water ranging from 12 to 27 metres (39 to 89 ft) deep. Electricity production started in early 2009, with a capacity of 30 MW. The capacity is expected to be increased gradually to 300 MW in 2015.

Contents

Thorntonbank Wind Farm Thornton Bank References ABB

Phases

The project is made of three phases.

First phase

Thorntonbank Wind Farm www04abbcomglobalseitpseitp202nsf0e13cc818

The first phase was built by C-Power and consists of six REpower offshore wind turbines of 5 MW capacity on the Thornton sandbank, at a cost of €153 million. It was commissioned in June 2009. A 37 km 150 kV undersea cable connects the Thorntonbank Wind Farm to the shore.

Thorntonbank Wind Farm Thornton Bank officially inaugurated Offshore Wind Industry

The first phase of what will ultimately be a 325 MW wind farm was completed in September 2008. The six REpower 5 MW turbines, which were installed on concrete gravity foundations, were linked to the Belgian power grid, giving a total rated capacity of 30 MW for the first stage. The full story of the design, engineering, construction and installation of the Thorntonbank Wind Farm (first phase) is told in an illustrated book that was published in November 2010.

Second and third phase

In these phases, a total of 48 additional wind turbines of 6.15MWp were installed.

Thorntonbank Wind Farm RWE announces all wind turbines installed at Thornton Bank wind farm

Phase 2 comprises the installation of 30 of the 48 wind turbines. These wind turbines have been installed on steel jacket foundations designed by OWEC Tower AS and assembled at Smulders, Hoboken.

Thorntonbank Wind Farm CPower completes first wind farm in the Belgian North Sea Marguerite

In the third and last phase, the remaining 18 wind turbines were installed, bringing the total capacity to around 325 MW.

A summary of the developing of Thornton Bank can be Found at WindEnergyUpdate on http://www.windenergyupdate.com/farshore-installation/presentations2012/102GeertDewaele.pdf

Environmental assessment

Thorntonbank Wind Farm FileThorntonbank wind farm 2344313916 1f72300524 ojpg Wikimedia

To assess the environmental impact C-Power has enlisted the assistance of the Research Institute for Nature and Forest (INBO ) and the Institute for Agricultural and Fisheries Research (ILVO ) to obtain the most detailed possible information on the occurrence of these animal species at Thornton Bank and to assess the possible effect of a wind farm on them.

How the Wind Farms affect on the landscape will be studied by WES-Onderzoek & Advies, who were also involved in earlier research in connection with the perceived impact on the landscape of near shore wind farms.

Offshore wind farms may affect sea fishing. Certain areas may be closed to commercial fishing, as a result of which the total area that can be fished is reduced, but new habitats may also be created as a result. The basis for this study is a thorough investigation of the importance of the Thornton Bank for sea fishing.

Offshore wind farms create new structures at sea and by definition they therefore pose an additional risk to the safety of shipping. C-Power has, however, chosen a location which is a long way from the most important shipping routes so that this risk can be reduced to a minimum. C-Power will be calling upon the specialised knowledge of German consultants Germanischer Lloyd.

Financing

Thorntonbank was only the second offshore wind farm to be Project Financed.