Status Complete Opening March 2008 Floor count 22 Height 89 m Floors 21 | Type Residential Roof 89.36 m (293.2 ft) Construction started 17 November 2005 Opened March 2008 | |
![]() | ||
Similar John A Roebling Suspensi, Frederic C Hamilton Building, Wohl Centre, Danish Jewish Museum, L Tower |
The ascent at roebling s bridge cincinnati s premier riverfront condominium community
The Ascent at Roebling's Bridge is a residential building in Covington, Kentucky, in the greater Cincinnati area. Designed by Daniel Libeskind, the building sits along the Ohio River across from the Roebling Suspension Bridge. It was commissioned in 2004 and was completed in March 2008 at a cost of approximately $50 million. Many newspapers have associated the Ascent with a trend toward signature architecture for residential buildings.
Contents
- The ascent at roebling s bridge cincinnati s premier riverfront condominium community
- Design
- References

Design

Libeskind cites the Ohio River and the Roebling Bridge as influences for his design. The building stands 293 feet (89 m) tall, 22 stories (comprising a lobby, parking level, amenities level, and 19 floors of luxury condominiums) and ends in a sloped spiral roof. The concrete structure slopes outward from its base on its eastern face and is clad in a glass curtain wall. It houses 70 condominiums.
Studio Daniel Libeskind collaborated with GBBN Architects, THP Limited, and KLH Engineering for the building's construction.



