Trisha Shetty (Editor)

Tallebudgera Creek Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Australia

Purpose
  
Recreation

Construction began
  
circa 1940s

Inflow source
  
Tallebudgera Creek

Impound
  
Tallebudgera Creek

Location
  
South East Queensland

Status
  
Decommissioned

Opening date
  
circa early 1950s

Owner
  
City of Gold Coast

Tallebudgera Creek Dam httpsuploadwikimediaorgwikipediacommonsthu

The Tallebudgera Creek Dam, or colloquially Tally Dam, is a decommissioned embankment dam across the upper reaches of the Tallebudgera Creek, located in the South East region of Queensland, Australia. The initial purpose of the dam from its establishment until its decommissioning during the 1970s was for the supply of potable water to the Gold Coast region. There is no public access to the dam.

Contents

Map of Tallebudgera Creek Dam, Tallebudgera Valley QLD 4228, Australia

Location and features

The Tallebudgera Dam is located approximately 16 kilometres (9.9 mi) south west of the Burleigh Heads.

Designed and constructed by the Coolangatta-Nerang Water Supply Board in the 1940s, construction of the Tallebudgera Dam was finalised in the early 1950s. The dam was one of the earliest water supplies for the region, and provided a constant flow to the intake that was located downstream of the dam. Growth and demand in the region led to the construction of Little Nerang Dam and Mudgeeraba Water Treatment Plant, which then made Tallebudgera Creek Dam obsolete as a water supply. The decommissioning is believed to have occurred in the 1970s and included the removal of the valve house and filling of the valve chambers. It appears that the dam was left for recreation purposes after decommissioning. Following introduction of the Water Act, 2000 (QLD), a Failure Impact Assessment noted the dam design did not comply with the latest safety standards and may over top during a 1 in 50 year average recurrence interval. The Queensland Department of Natural Resources and Water issued advice that the dam was to be upgraded to meet the current dam safety standards. Options considered were to permanently lower the level of the spillway, install flood-triggered gates and removal of the dam. In 2006, after two years of investigation, reports and public consultations, work commenced to upgrade the existing dam to the required standards.

References

Tallebudgera Creek Dam Wikipedia