Country India Commission date February 1995 Phone 06760 247 619 | Status Operational Owner(s) NTPC Units operational 6 × 500 MW | |
![]() | ||
Hours Open today · Open 24 hoursSundayOpen 24 hoursMondayOpen 24 hoursTuesdayOpen 24 hoursWednesdayOpen 24 hoursThursdayOpen 24 hoursFridayOpen 24 hoursSaturdayOpen 24 hoursSuggest an edit Make and model Brown, Boveri & Cie, Bharat Heavy Electricals |
Talcher Super Thermal Power Station or NTPC Talcher Kaniha located in Angul district of the Indian state of Odisha is the first mega power plant of India to have an installed generation capacity of 3000MW. The power plant is one of the coal-based power plants of NTPC. The coal for the power plant is sourced from Lingraj Block & Kaniha coal block of Mahanadi Coalfields Ltd. Source of water for the power plant is from Samal Barrage Reservoir on Brahmani River.
The plant supplies power to Indian states of Odisha, Andhra Pradesh, Karnataka, Telangana as well as Bihar and West Bengal. The East South Interconnection of the Indian power grid starts from NTPC kaniha and ends at Kolar in Karnataka. This being a DC link is one of its kind in India as uptill now there are only 3 installed HVDC system present in India. The Southern grid is weakly interconnected to the National grid of India through the Talcher-Kolar HVDC system in the East.