Place
  
Swindon

Station code
  
SWI

2011/12
  
3.235 million

Address
  
Swindon, United Kingdom

Managed by
  
Great Western Railway

Local authority
  
Borough of Swindon

Grid reference
  
SU149851

DfT category
  
C1

2012/13
  
3.220 million

Opened
  
1842

Number of platforms
  
4

Swindon railway station

Similar
  
Bristol Parkway railway st, Didcot Parkway railway st, Bath Spa railway station, Cheltenham Spa railway st, Bristol Temple Meads rai

Swindon railway station is on the Great Western Main Line in South West England, serving the town of Swindon, Wiltshire. It is 77 miles 23 chains (124.4 km) down-line from London Paddington and is situated between Didcot Parkway and Chippenham on the main line. It is managed by Great Western Railway, which also operates all the trains.

Contents

It is an important junction, where the former Great Western Railway line to Gloucester and Cheltenham Spa, the main line to Bristol Temple Meads, and the South Wales Main Line via Bristol Parkway diverge.

It is approximately 220 yards (200 m) from the central bus station and the town centre. It is served by GWR services from Paddington to Bristol Temple Meads, Cardiff Central, Cheltenham Spa via Gloucester, Swansea and the rest of South Wales, and to Westbury.

History

With the railway passing through the town in early 1841, the Goddard Arms public house in Old Swindon was used as a railway booking office in lieu of a station. Tickets purchased included the fare for a horse-drawn carriage to the line at the bottom of the hill.

Swindon railway station opened in 1842 with construction of the Great Western Railway's engineering works continuing. Until 1895, every train stopped here for at least 10 minutes to change locomotives. Swindon station hosted the first recorded railway refreshment rooms, divided according to class. Swindonians, for a time, were eminently proud that even the current King and Queen of the time had partaken of refreshments there. The station in 1842 was built of three storeys, with the refreshment rooms on the ground floor, the upper floors comprising the station hotel and lounge. Until 1961, when Swindon Town station closed, the station was known as Swindon Junction.

The building was demolished in 1972, with today's modern station and office block erected on the site.

The Travel Centre (i.e. booking office) at Swindon was APTIS-equipped by the end of October 1986, making it one of the very first stations with the ticketing system which was eventually found across the UK at all staffed British Rail stations by the end of the 1980s.

On 2 June 2003 Platform 4 opened. Prior to this all westbound trains had used Platform 3 and eastbound services Platform 1. Services terminating or starting here on the lines to Westbury via Chippenham and Gloucester use platform 2, a west-facing inset bay.

Awards

  • 2004 – Station Excellence of the Year Award won. The year-old Platform 4 had saved hundreds of minutes of passenger time, as it removed a bottleneck at the station.
  • 2005 – Staff at the station received an internal award, First for Service, for their outstanding customer treatment.
  • Panel Box

    The railway in the vicinity of Swindon station and for a distance of about 20–30 miles in each direction towards Didcot, Bristol, South Wales and Gloucester is controlled from a signal box situation behind platform number 4. The panel box is a Western Region Integra design built by Henry Williams (Darlington) and opened in March 1968. The panel box was decommissioned in February 2016 and has been secured for preservation at Didcot Railway Centre.

    Plans

    It was announced in December 2005 that stations in the Thames Valley region were to be upgraded.

    In August 2014, Network Rail completed the redoubling of the track between Swindon and Kemble in order to improve rail services between London and Cheltenham/Gloucester, and to allow for maintenance work in the Severn Tunnel when Swansea services are diverted via Gloucester. When originally laid in 1842 the line was double-track throughout, however some 12 14 miles (19.7 km) of the second track were removed in 1968/69. As of July 2008, the Office of Rail Regulation was receiving submissions to restore this project (previously omitted) to Network Rail's plans for 2009–2014. The project cost was estimated at £50.2 million and received backing from the South West Development Agency and others but stalled when it was left out of the new Coalition Government's Spending Review in October 2010. Work commenced in January 2013 and was completed in August 2014.

    On 1 March 2011, Secretary of State for Transport Phillip Hammond announced that plans for electrifying the Great Western main line west from Didcot through Swindon to Bristol and Cardiff had resumed at a planned cost of £704 million. The electrification project had first been announced by the previous Government's Transport Secretary Andrew Adonis, on 23 July 2009.

    References

    Swindon railway station Wikipedia


    Similar Topics