Locale Surat, India Number of lines 15 (Phase I & II) | Transit type Rapid transit Number of stations 148 | |
Began operation November 2013 (Phase I) System length 114 kilometres (71 mi) (Phase I & II) |
The Sitilink or Surat BRTS is a Bus rapid transit for Surat, Gujarat, India. It has been operational since 26 Jan, 2014. Trial run for bus started on Udhana-Sachin Corridor. Free rides for people have started from 26th January 2014 for 1 month, then the fares would be levied and the bus numbers would be increased. "S-Connect" Integrated bus system will start soon which will connect Surat BRTS & Surat City Bus together with one ticket through journey from Surat Railway Station to Sachin GIDC/ Sachin Gam. Turnstile gates will be installed at all BRT stations by 2018 for which tenders have been floated by Surat Municipal Corporation.
Contents
Phase 1
Two corridors have been proposed in Phase 1.
Phase 2
Phase 2 consists of 9 corridors.
Interchange Locations
A total of 10 interchange has been proposed at the following locations.