Sultan Mahmud Power Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Location
  
Terengganu, Malaysia

Impounds
  
Kenyir River

Total capacity
  
13.6 km (3.3 cu mi)

Length
  
800 m

Create
  
Kenyir Lake

Operator
  
Tenaga Nasional

Opening date
  
1988

Creates
  
Kenyir Lake

Height
  
150 m

Catchment area
  
2,600 km²

Construction began
  
1978

Official name
  
Sultan Mahmud Power Station

Similar
  
Sultan Mahmud Airport, Chenderoh Power Station, Pergau Dam, Batang Ai Dam, Terengganu Inscription Stone

Sultan Mahmud Power Station or Kenyir Dam (Malay: Empangan Kenyir) is the hydroelectric dam which forms Kenyir Lake, Terengganu, Malaysia. It is located 50 km southwest of Kuala Terengganu on the Kenyir River. The project is a multipurpose hydroelectric power and flood mitigation scheme.

Contents

Map of Sultan Mahmud Power Station, 21700 Kuala Berang, Terengganu, Malaysia

History

The Kenyir River was first identified for hydroelectric potential in 1961 but it proved uneconomical due to low energy demand and high cost of construction. Years later in 1972 the Malaysian government revived the study and further site investigations were proceeded.

Construction started in 1978 and was completed in 1985. In 1987 the dam was officially opened by Sultan Mahmud Al-Muktafi Billah Shah the Sultan of Terengganu. The dam's power station was named after the Sultan as the "Sultan Mahmud Hydro Electric Power Station". The station is operated by Tenaga Nasional Berhad.

Kenyir dam technical specifications

The power station is a hydroelectric power station, using four turbines of 100 megawatt each. Continuous power output is 165 MW. Average annual energy output is 1,600 GWh.

The dam is 150 m in height above foundation, with a crest length of 800 m, and the dam fill volume is 15.20 million cubic metres. Crest elevation is 155 m above sea level (ASL) while maximum flood level is 153 m. The maximum operating level is 145 m and a minimum of 120 m. The reservoir surface area at 145 m ASL is 370 km², and with a catchment area of 2,600 km². Storage capacity is 13,600 million cubic metres.

In case of overflow during monsoon seasons there is a spillway that is ungated/free flow, with a maximum capacity of 7,000 cubic metres per second. Water flows through four penstocks into four turbines turning four air-cooled electric generators rated at 100 megawatt each.