Suvarna Garge (Editor)

Stockholm metro

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Native name
  
Stockholms tunnelbana

Transit type
  
Rapid transit

Number of stations
  
100

Locale
  
Stockholm, Sweden

Number of lines
  
7

Stockholm metro

Daily ridership
  
898,630 (average, 2013)

The Stockholm metro (Swedish: Stockholms tunnelbana, literally: Stockholm's Tunnel Rail) is a metro system in Stockholm, Sweden. The first line opened in 1950, and today the system has 100 stations in use, of which 47 are underground and 53 above ground. There are three coloured main lines on the tube maps. These do however form seven actual routes (with different termini). Routes number 17, 18 and 19 (belonging to the green main line), 13 and 14 (red main line) and 10 and 11 (blue main line) all go through Stockholm City Centre in a very centralized metro system. All seven actual lines use The T-Centralen hub station. Apart from this Central Station for the metro, there exists just one other junction, the Fridhemsplan station, although both the green and red lines are mutually accessible at the Slussen and Gamla Stan stations.

Contents

The metro is like the London Underground and the Paris Métro, but unlike the U-Bahn and S-Bahn in Berlin, in that it is equipped with ticket gates. Single tickets must be bought in advance (typically in privately owned smaller shops and kiosks), or at ticket machines that are available in all underground stations and on several tram- bus- or boat stops. Passengers can also buy tickets at the ticket booth, just by the gates to the metro.

In 2013, the metro carried 328 million passengers, which corresponds to approximately 898,630 riders per day. The 105.7-kilometre-long (65.7 mi) metro system is owned by the Stockholm County Council through the company Storstockholms Lokaltrafik (SL). The operation is contracted to MTR Corporation.

The Stockholm metro system has been called 'the world's longest art gallery', with more than 90 of the network's 100 stations decorated with sculptures, rock formations, mosaics, paintings, installations, engravings and reliefs by over 150 different artists.

History

The decision to build a metro was made in 1941. The following years, and in some cases earlier, some routes were built with near metro standard but operated with trams. These included Kristineberg-Islandstorget, Slussen–Blåsut (including the oldest tunnel Slussen–Skanstull from 1933) and Telefonplan–Hägerstensåsen. The first part of the metro was opened on 1 October 1950, from Slussen to Hökarängen, having been converted from tram to metro operation. In 1951 a second line from Slussen to Stureby was opened (this was also tram operated until then). In 1952, a second system, from Hötorget to the western suburbs was opened. In 1957, the two parts were connected via the Central station (at T-Centralen) and the Old Town (at Gamla stan metro station), forming the Green Line. During the period 1950-1960 the Green Line was extended piece by piece.

The Red Line was opened in 1964, from T-Centralen over Liljeholmen ending in Fruängen and Örnsberg, both in the Southwest. It was extended piece by piece until 1978. The third and final system, the Blue Line, was opened in 1975, with two lines running northwest from the city center. As the construction requirements have become more strict over the years, newer segments have more tunnels than older, and the Blue Line is almost all in tunnel. The latest addition to the whole network, Skarpnäck station, was opened in 1994.

Stations

There are 100 stations in use in the Stockholm metro (of which 47% are underground). One station, Kymlinge, was built but never taken into use. One station has been taken out of use and demolished. The Bagarmossen old surface station was demolished and replaced with a new underground station, this being prior to the metro extension to the Skarpnäck metro station.

The Stockholm metro is well known for its decoration of the stations; it has been called the longest art gallery in the world. Several of the stations (especially on the Blue Line) are left with the bedrock exposed, crude and unfinished, or as part of the decorations. At Rissne, an informative wall fresco about the history of Earth's civilizations runs along both sides of the platform.

Lines

The following details relate to the present network. The designations "blue line", etc., have only been used since the late 1970s, and officially only since the 1990s. They originated from the fact that the "blue line" tended to operate newer train stock painted blue, while the "green line" had older stock in the original green livery. There was never any red painted stock, though, but red (or originally orange) was chosen to differentiate this line from the other two networks on route maps.

  • The Green line (officially Tunnelbana 1, or "Metro 1") has 3 routes and 49 stations: 12 subterranean (nine concrete, three rock) and 37 above ground stations. The track is 41,256 metres long. It opened 1 October 1950 (between Slussen and Hökarängen stations). It is used by 451,000 passengers per workday or 146 million per year (2005).
  • The Red line (Tunnelbana 2) has 2 routes and 36 stations: 20 subterranean (four concrete, 16 rock) and 15 above ground stations. The track is 41,238 metres long. It opened 5 April 1964. It is used by 394,000 passengers per workday or 128 million per year (2005).
  • The Blue line (Tunnelbana 3) has 2 routes and 20 stations: 19 subterranean (all rock) and one elevated station. The track is 25,516 metres long. It opened 31 August 1975. It is used by 171,000 passengers per workday or 55 million per year (2005).
  • Trains are operated from 05:00 to 01:00, with extended all night service on Fridays and Saturdays. All lines have trains every 10 minutes during daytime, reduced to every 15 minutes in early mornings and late evenings, and every 30 minutes during nights. Additional trains in peak hours gives a train every 5–6 minutes on most stations, with 2–3 minutes between trains on the central parts of the network.

    The metro contains four interchanges (T-Centralen, Slussen, Gamla Stan and Fridhemsplan) and lacks any kind of circular or partly circular line (although Stockholm has a semi-circular light rail line, Tvärbanan). A wide majority of the metro stations are located in suburbs, but the network is centred on T-Centralen where all trains in the entire network pass.

    In the past, there have been additional line numbers in use for trains operated on part of a line, or during peak hours only. For example, line number 23 was used for a peak relief train for line 13 which in the 1970s was operated between Sätra and Östermalmstorg and during the 1990s between Norsborg and Mörby Centrum.

    Rolling stock

    There are two main types of cars in the Stockholm metro: the newer C20 stock, and the older C1–C15 stocks, which are collectively referred to as the Cx stock. A train typically consists of two or three cars of the C20 stock connected in double or triple configuration (six or nine cars), or six or eight cars of the Cx stock. A full length train—three C20 cars, or eight Cx cars—is about 140 metres (460 ft) in length, and takes about 1,250 passengers, of which about 380 can be seated. The Blue Line—as well as the Red Line (from Stadion to Mörby Centrum)—was built with longer platforms to allow running trains consisting of ten Cx cars. When the C20 was introduced, it appeared that trains consisting of four C20 cars would not fit completely on these platforms.

    There are 271 cars of the C20 stock, and around 250 Cx stock cars. The green line only uses the new cars, and they are used most of the time on the Red and Blue Lines. However, during rush hours, especially on shortened services, older cars are commonly seen. Of the older cars the stocks C6, C14 and C15 are still in use, with the C6's operating on the red line and the C14/C15's on the blue line. C14/C15 trains may occasionally show up on the red line as well. All trains are based at Hammarby, Högdalen and Vällingby Depots on line 17, 18 and 19, Nyboda Depot on line 13 and 14, and Rissne Depot on line 10 and 11.

    Historically the metro is converted from a tramway and the older sections were run as tramway for a few years. The naming convention for rolling stock comes from this, where A are motorised trams, B are unmotorised trams (trailers) and C are metro cars.

    Cx stock cars

    The name Cx refers to all the older types C1–C15. The only cars of the Cx stock still in use are C6, C14 and C15. They are 17.32 m (56.8 ft) to 17.62 m (57.8 ft) in length, 2.8 m (9.2 ft) in width, 3.70 m (12.1 ft) to 3.78 m (12.4 ft) in height, and weigh 23 to 29 metric tons. The cars take 48 seated passengers, and 108 to 110 standing passengers. They were built in the 1970s and 1980s.

    C20 stock cars

    The C20 car is double-articulated, 46.5 metres (153 ft) in length, 2.9 metres (9.5 ft) in width, 3.8 metres (12 ft) in height, and weighs 67 tonnes (66 long tons; 74 short tons). It uses only four bogies, two under the middle part, and one under each end part of car. The car takes 126 seated passengers, and 288 standing passengers. The C20 stock cars were built between 1997 and 2004 and first entered service in 1998.

    A single prototype car designated C20F stock is in use. Built on Bombardier Transportation's FICAS technology, it has a lighter body, much thinner side walls, and more space compared to the regular C20, by using a sandwich-like composite construction of the body. It also has air-conditioning for passenger area, whereas standard C20 has air-conditioning only for the driver's cab. The C20F weighs 65 tonnes (64 long tons; 72 short tons), other exterior measurements are the same as for the C20. The C20F has the same number of seats as the C20, but has space for 323 standing passengers.

    C30 stock cars

    The C30 is a future articulated train type intended to be delivered from 2016 onwards for use on the red line. The 80 cars are expected to cost 2-3 billion kronor.

    Infrastructure and safety

    The Stockholm metro runs electrically using a third rail with a nominal operating voltage of 650 V DC on line 13, 14, 17, 18 and 19; and 750 V DC on lines 10 and 11.

    The maximum speed is 80 kilometres per hour (50 mph) on the Red and Blue Lines, 70 kilometres per hour (43 mph) on the Green Line (50 kilometres per hour (31 mph) at the platforms). Maximum acceleration and deceleration is 0.8 m/s2. The reason for the lower speed limit on the Green Line is due to tighter curves than on the other lines, because the Green Line was built by cut and cover under streets in the inner city, while the other lines are bored at greater depth. Two safety systems exist in the metro: the older system manufactured by Union Switch & Signal in use on the Red and Blue Lines and a newer autopilot system in use on the Green Line and manufactured by Siemens.

    To allow close-running trains with a high level of safety, the metro uses a continuous signal safety system that sends information continually to the train's safety system. The signal is picked up from the rail tracks through two antennas placed in front of the first wheel axle and compared with data about the train's speed. Automatic braking is triggered if the train exceeds the maximum permitted speed at any time. The driver is given information about the speed limit through a display in the driver's cabin; in C20 stock, and in Cx stock outfitted for operation with the new signal system installed on the Green Line, this is a speedometer with a red maximum speed indicator (needle), while the traditional display in the Cx stock is a set of three lights indicating one of three permitted speeds (high, medium, low). The system allows two trains to come close to each other but prevents collisions occurring at speeds greater than 15 kilometres per hour (9.3 mph). More modern systems also ensure that stop signals are not passed.

    Another possibility is automatic train operation, which helps the driver by driving the train automatically. However, the driver still operates the door controls and allows the train to start. ATO is as of 2006 only available on the Green line, where a new signal system was installed in the late 1990s. This signal system, together with the C20 rolling stock, permits the use of ATO. The signalling system on the Red Line is however being replaced with Communications-based train control manufactured by Ansaldo STS which will go into operation in 2014.

    Graffiti

    Since the mid-1980s, the Stockholm metro has been seriously affected by graffiti. Previously a train on which graffiti had been painted could remain in service for weeks and graffiti could remain in place at stations for months if not for years. Nowadays, however, trains with graffiti are taken out of service immediately and graffiti at stations is regularly cleaned up within a few days. The cost of graffiti and other types of vandalism has been calculated at approximately SEK 100 million per year.

    During the 1990s, the Stockholm Transit System (SL) started outsourcing security to private security firms, some of which have been accused of using unlawful methods, such as the use of plainclothes guards and heavy-handed treatment of vandals arrested, and even heavy-handed treatment of ticketless passengers trying to escape. Since 2005, the Stockholm Police have assigned a special task force (Klotterkommissionen) to address these issues. The mainstay among the private security contractors in the fight against graffiti is the Commuter Security Group.

    Future

    In 2013, it was announced that agreement had been reached on the future of several extensions. Preliminary planning started in 2016 and revenue service on the first sections is projected to begin in 2020.

  • Extension of the Blue Line southwards from Kungsträdgården. There will be a new station at Sofia on Södermalm, after which the line splits with one branch continuing to Nacka (with three new intermediate stations), and the other to new underground platforms at Gullmarsplan after which it will take over the current Green line branch to Hagsätra. This allows higher frequencies on the Green Line branches to Farsta strand and Skarpnäck which are currently limited by the fact that three branches passes the bottleneck at T-Centralen.
  • Extension of the Blue Line north-west from Akalla to Barkarby railway station via one new station.
  • Construction of a new fourth metro line, initially consisting of a short three-station line running north from Odenplan via the new development at Hagastaden and ending in Arenastaden. This is planned for eventual extension to Danderyd and Täby in the north-east, interchanging with the existing Red Line to Mörby centrum.
  • References

    Stockholm metro Wikipedia