Opened
  
5 December 1999

Silom Line Silom line39s extension faces delay

Owner
  
Bangkok Metropolitan Administration

Terminis
  
Bang Wa BTS Station, National Stadium BTS Station

The Elevated Train in Commemoration of HM the King's 6th Cycle Birthday Second line (Silom) or Silom Line is a route of the BTS Skytrain in Bangkok, Thailand. It runs eastward from the National Stadium Station in Pathum Wan District over Rama I Road and interchanges with the Sukhumvit Line at Siam BTS Station, then turns southward, following Ratchadamri, Si Lom, Narathiwat Ratchanakharin and Sathon Roads to Taksin Bridge where it crosses the Chao Phraya River and terminates at Bang Wa Station in Phasi Charoen District. The line is represented on the official BTS map in dark green. 22 March 2013

Contents

Silom Line PLACES BY LOCATION Bangkok Thailand Sky Map Bangkok

History

Silom Line The mass transit factor Ajarn Street Ajarncom Teaching

Originally consisting of seven stations from National Stadium (W1) to Saphan Taksin (S6) when the BTS first opened 5 December 1999. A planned station at S4 was not built but is now planned for 2017 construction and opening in 2018.

Extensions and current construction

A 2.2 km extension across the river to Wongwian Yai (S8) opened 15 May 2009 after many years of delay. Originally, this extension was due to open in 2007.

Silom Line wwwbangkokbtscomimagesbtssilomlinejpg

A further 5.3 km, 4 station extension from Wongwian Yai (S8) to Bang Wa (S12) in Phasi Charoen District was delayed for many months by the Bangkok floods of late 2011.

Silom Line Silom Line Wikipedia

The first station of extension, Pho Nimit (S9) opened on 12 January 2013. The second station of the extension, Talat Phlu (S10) opened on 14 February 2013. The extension was initially operated by a separate 6 car shuttle service due to the absence of a turnout between Wongwian Yai (S8) and Talat Phlu (S10).

The remaining two stations Wutthakat (S11) and Bang Wa (S12) were opened on 5 December 2013.

Future extension plans

Silom Line New Skytrains arrive for the Silom Line Richard Barrow

South: After the opening of S11 & S12 on 5 December 2013 the BMA announced a new proposal to further extended the Silom line by 7 km from Bang Wa (S12) station, by six stations to Taling Chan. Here, it would connect with the SRT Light Red line.

A public hearing was held in 2015. Three route options are under considetation. If approved, construction would break ground in 2017 and be completed by 2019 for a planned 2020 opening. Part of the basis for this further extension by the BMA is that it would provide proximate access to the Southern Bus Terminal. This proposal in currently under preliminary study by the BMA.

West: The Silom line is planned to be extended by two stations west from National Stadium (W1) to link with the SRT Dark Red line at Yot Se station. However, no time frame for this extension has been announced and this section of the Dark Red line will not be built until after 2018.

Originally, the plan was to extend the Silom line west from National Stadium into Chinatown, then north to Democracy Monument where it would then run west to Rattanakosin Island and Sanum Luang, tunnel under the river to the Thonburi side before terminating at Phrannok. However, this plan was shelved back in 2009 and much of this route has been replaced by routing changes to the planned MRT Orange line.

References