Kalpana Kalpana (Editor)

Siegel Center

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Surface
  
Hardwood

Capacity
  
7,617

Phone
  
+1 804-827-1000

Broke ground
  
April 23, 1996

Opened
  
1 May 1999

Team
  
VCU Rams men's basketball

Siegel Center

Location
  
1200 West Broad Street Richmond, Virginia, 23284, USA

Operator
  
Virginia Commonwealth University

Construction cost
  
$30.1 million ($43.3 million in 2017 dollars)

Architect
  
Marcellus Wright Cox & Smith

Address
  
1200 W Broad St, Richmond, VA 23284, USA

Owner
  
Virginia Commonwealth University

Similar
  
Monroe Park, Richmond Coliseum, E Claiborne Robins St, The Diamond, Downtown Richmond - Virginia

A day in the life of the siegel center


Stuart C. Siegel Center is a 190,000-square-foot (18,000 m2) multi-purpose facility on the campus of Virginia Commonwealth University in Richmond, Virginia, United States. The facility's main component is the 7,637-(expandable to 8,000) seat E.J. Wade Arena. It also served as a student recreational area until 2010, when the new Cary Street Gym complex was completed. It now is used purely for VCU athletics and includes a weight room, auxiliary basketball court, and a cafè. The E.J. Wade Arena hosts Division I level NCAA inter-collegiate athletics and serves as a general-purpose assembly space for special events such as graduations, concerts, receptions, and a variety of competitions (both athletic and non athletic). It is named after Richmond businessman Stuart C. Siegel. At times, it is affectionately referred to as the HavocDome by its fans, which comes from the name of VCU's full-court press style of play began under head coach Shaka Smart known as "Havoc".

Contents

The "Stu" opened in 1999 and cost $30.1 million to construct. Its main tenant is the VCU Rams men's basketball team, which enjoys one of the nation's best home court winning percentages since moving into the facility. The court has received the reputation as arguably the toughest place to play in the Atlantic 10 Conference. The VCU Rams men's basketball team currently holds the 11th-highest home court winning percentage in Division I basketball with a winning percentage of 85.79 The student section, dubbed the "Rowdy Rams", is extremely passionate and near deafening during contests. In 2012-2013, the Rowdy Rams received the Naismith Student Section of the Year Award, recognizing the best student section in college basketball. Since January 2011, every home game at the Siegel Center has been sold out and the streak currently stands at 98. The arena also routinely hosts local and state high school basketball tournaments, in addition to hosting the annual Virginia Regional (formerly VCU/NASA) FIRST Robotics Competition.

Before the 2016-2017 basketball season, the arena was renamed the E.J. Wade Arena; a construction company owned by a local family in Mechanicsville, VA. The deal is for $2.75 million over ten years, but the Wade family has promised a total monetary donation of $4.05 million over those ten years. This deal replaces the old Verizon Wireless one which was worth $165,000 annually.

Future Expansion

Plans are in the works to upgrade the Siegel Center's capacity to 10,000 seats with a total cost of $12 million. Currently there is a wait list of 1,100 people for season tickets.

Recent expansion

In 2011, a $3.4 million facelift to the Siegel Center added luxury suites, a 120-club seat balcony, renovated offices and a new lounge, the Tommy J. West Club. In 2014, the most major renovation since the Tommy J. West club was completed. Four corporate corner suites were installed in one end of the arena. A new Daktronics HD center-hung scoreboard was installed at center court, it features four 11.5' by 15.5' panels, and the lower ring is 2' high by 15.5' wide. The Tommy J. West club was also outfitted with a large HD ribbon board that measures 2.5' high by 136' wide. The old center-hung audio system was also replaced. Now, speakers are peppered throughout the arena's roof to further immense the audience in the action. The total cost of the renovation was $1.9 million. In 2016, the arena added four more corporate corner suites opposite the arena side that was completed in 2014. All four corners of the Siegel Center now have suites. There are four smaller ones which cost $45,000, and four larger ones which cost $60,000. Each suite requires a three year commitment.

References

Siegel Center Wikipedia


Similar Topics