Samiksha Jaiswal (Editor)

Seibu Shinjuku Line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Native name
  
西武新宿線

Locale
  
Kanto region

Daily ridership
  
945,302 (FY2010)

Owner
  
Stations
  
29

Opened
  
1894

Seibu Shinjuku Line We Finns just like it simple funny

Terminis
  

Japan trip 2012 tokyo trains run of seibu shinjuku line railway crossing


The Seibu Shinjuku Line (西武新宿線, Seibu-Shinjuku-sen) is a Japanese railway line owned by the private railway operator Seibu Railway, connecting Seibu Shinjuku Station in Shinjuku, Tokyo with Hon-Kawagoe Station in Kawagoe, Saitama.

Contents

Seibu Shinjuku Line EdoTokyo Open Air Architectural Museum at Koganei Park digijoho

The Shinjuku Line is one of two main lines of the Seibu Railway system along with the Ikebukuro Line. The two main lines cross at Tokorozawa Station in Tokorozawa, Saitama. The line serves the western suburbs of Tokyo, connecting them to Shinjuku and other areas of downtown Tokyo.

Seibu Shinjuku Line Guest house Ogu

Seibu shinjuku line


Description

Seibu Shinjuku Line Where are my chopsticks Map Mixup on the SeibuShinjuku Line

The line is mostly double-track, except for 1.1 km of single track between Wakita Junction and Hon-Kawagoe Station. While the section from Seibu-Shinjuku to Takadanobaba is elevated, the line runs at ground level through a suburban area until Saginomiya.

Trains

Seibu Shinjuku Line httpsuploadwikimediaorgwikipediacommonsthu

Five types of train service are operated on the line: Local, Semi Express, Express, Commuter Express, and Koedo limited express, as shown below. Limited Express trains use Seibu 10000 series EMUs, and a supplementary limited express ticket is required.

Seibu Shinjuku Line SEIBU RAILWAY

There are regular through operations to the Haijima Line and the Kokubunji Line. There are also occasional through services to Seibu-Kyūjō-mae Station in order to bring fans to the Seibu Dome for Saitama Seibu Lions baseball games. The Seibu Shinjuku Line is one of the few major commuter rail lines in Tokyo that does not have through service to the Tokyo Metro or Toei Subway network.

Stations

O: stop|: pass     L: Local (各停, Kakutei) stop at all stations, not shown     SE: Semi Express (準急, Junkyū)     E: Express (急行, Kyūkō)     CE: Commuter Express (通勤急行, Tsūkin Kyūkō)     LE: Koedo Limited Express (特急 "小江戸")

Rolling stock

A fleet of eight 10-car Seibu 40000 series EMUs is scheduled to be introduced from spring 2017, operating on the Seibu Ikebukuro, Seibu Shinjuku, and Seibu Haijima Lines.

History

The oldest section of the Shinjuku Line is between Higashi-Murayama Station and Hon-Kawagoe Station. This section was built by the Kawagoe Railway (川越鉄道, Kawagoe Tetsudō) to serve as a freight feeder for the Kōbu Railway (甲武鉄道, Kōbu Tetsudō) between Shinjuku and Tachikawa (now known as the Chūō Main Line). The initial Kawagoe Railway route opened between Kokubunji and Kumegawa in 1894; this portion is now known as the Seibu Kokubunji Line. Its northward extension to Kawagoe, the first part of what is now the Seibu Shinjuku Line, opened in 1895. Following several mergers and name changes between 1920 and 1922, the Kawagoe Railway became part of the Seibu Railway.

In 1927, Seibu Railway built its new dual track, electrified at 1,500 V DC, Murayama Line between Takadanobaba Station on the Yamanote Line in Tokyo and Higashi-Murayama Station to compete with Musashino Railway (武蔵野鉄道, Musashino Tetsudō) (present-day Seibu Ikebukuro Line) and the Japanese National Railways Chūō Main Line, the route being in the middle of the two. The rest of the line was electrified at the same time.

The Higashi-Murayama to Tokorozawa section was double-tracked between 1950 and 1958, with the Tokorozawa to Irimagawa section double-tracked between 1967 and 1975. The rest of the line (except for the section between the Wakita Junction and Hon-Kawagoe Station) was double-tracked between 1980 and 1991.

In 1952, a dual-track extension from Takadanobaba to Seibu-Shinjuku Station was completed. At this time the line was renamed the Shinjuku Line, integrating the Murayama Line and the northern section of the Kawagoe Line. The new Seibu-Shinjuku terminal was built as a temporary station, as Seibu planned to extend the line to the second floor of what is now known as Lumine Est on the east side of Shinjuku Station. This plan was later scrapped due to insufficient space to handle trains longer than six cars. Seibu-Shinjuku Station was expanded to include a high-rise hotel in 1977.

During the 1960s, Seibu unsuccessfully negotiated with the Teito Rapid Transit Authority to offer through service between the Shinjuku Line and Tozai Line. Seibu's approach was rejected in favor of through operation with the Chuo Main Line.

In the 1980s, Seibu drew up a plan to build an underground line for express trains between Seibu-Shinjuku and Kami-Shakujii, including a new underground station between Seibu-Shinjuku and the Metro Promenade. This plan was indefinitely postponed in 1995 due to costs and a decline in passenger ridership versus previous projections. Seibu was also a bidder to acquire the former JR freight terminal site in 1989, where they planned to build a new underground terminal; Takashimaya won the bid and constructed the Takashimaya Times Square complex on the site.

From the start of the revised timetable on 30 June 2012, the limited-stop Rapid Express (快速急行, kaisoku-kyūkō) services were abolished.

Station numbering was introduced on all Seibu Railway lines during fiscal 2012, with Seibu Shinjuku Line stations numbered prefixed with the letters "SS".

References

Seibu Shinjuku Line Wikipedia


Similar Topics