Girish Mahajan (Editor)

Sarawak Energy

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Public

Area served
  
Sarawak

Founded
  
1932

Parent organization
  
Sarawak Energy Berhad

Industry
  
Electrical power

Headquarters
  
Kuching

Number of employees
  
4,200

Sarawak Energy scholarshipscurtinedumywpcontentuploadssite

Predecessor
  
Sarawak Electricity Supply Co.Ltd. (1932-1962) Sarawak Electricity Supply Corporation (SESCO) (1962-2005) Syarikat SESCO Berhad (2005-2012)

Key people
  
Datuk Abdul Hamed Sepawi (Chairman) Datuk Torstein Dale Sjøtveit (CEO)

Products
  
Electricity generation, transmission and distribution

CEO
  
Sharbini Suhaili (1 Nov 2016–)

Subsidiaries
  
SESCO-EFACEC Sdn. Bhd.

Sarawak energy berhad seb auxiliary police parade 2016


Sarawak Energy Berhad (SEB) is responsible for the generation, transmission and distribution of electricity for the state of Sarawak in Malaysia. It is wholly owned by the State Government of Sarawak.

Contents

As of May 2016, Sarawak Energy has about 600,000 customers in the state.

Sarawak energy


History

Sarawak Energy's history began in 1932, with the formation of Sarawak Electricity Supply Company Limited, by the Brooke Administration, to operate public electricity supply within Sarawak. Prior to that, in 1921 a Electrical Section within the Public Works Department was set up to look after the public electricity supply.

In 1962, under the Sarawak Electricity Supply Corporation Ordinance 1962, the Sarawak Electricity Co. Ltd. was dissolved,and later created into a Corporation, known as Sarawak Electricity Supply Corporation (SESCO) (Malay: Perbadanan Pembekalan Letrik Sarawak, and later Perbadanan Pembekalan Elektrik Sarawak or PPLS). In 1996, Sarawak Enterprise Corporation Berhad bought over 45% stake of the Corporation from the Sarawak Government.

In 2005, SESCO was privatised and known as Syarikat SESCO Berhad, until it was renamed in 2012 to "Sarawak Energy Berhad".

In January 2016, Sarawak began to export electricity from Sarawak to West Kalimantan, Indonesia through a 275kV interconnection operated by Sarawak Energy. This project is the first successful power trading project for Malaysia.

Corporate information

Subsidiaries

Generation capacity

It has 36 power stations, a total installed capacity of 1315MW, comprising 5 per cent diesel engine, 25.6 per cent gas turbines, 36.5 per cent coal-fired power plant, 25 per cent Combined Cycle power station and 7.6 per cent hydro turbines throughout the state. The major towns are connected to via a 275/132kV State Transmission Grid.

SESCO generates electricity mainly from two major types of plant; hydroelectric plants and thermal plants.

Hydroelectric power plants

  • Batang Ai Dam - 4 x 25 MW = 100 MW.
  • Bakun Dam - 2,400MW
  • Murum Dam - 944MW
  • Thermal power plants
    There are 35 thermal power plants and diesel-electric plants with installed generating capacity of 1215 MW in operation. Selected major plants are:

  • Tun Abdul Rahman Power Station, Kuching - 46 MW Gas Turbine and 68 MW Diesel engine.
  • Miri power station, Miri - 99 MW, Open Cycle Gas Turbine
  • Bintulu power station, Bintulu - 330 MW, Combined Cycle Power Plant
  • Tg Kidurong Power Station, Bintulu - 192 MW, Open Cycle Gas Turbine
  • Sejingkat Power Station, Kuching - 210 MW, coal-fired power station (phase II)
  • Mukah Power Station, Mukah - 2 x 135 MW, Coal Fired Power Station
  • Balingian Coal Fired Power Station, Balingian - 600MW
  • A notable aspect of SESCO operation is the many small diesel-electric power plants in isolated areas, some supplied by air at prohibitive cost.

    References

    Sarawak Energy Wikipedia


    Similar Topics