Kalpana Kalpana (Editor)

Sangupiddy Bridge

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Crosses
  
Constructed by
  
Access Engineering

Total length
  
288 m

Designer
  
Mabey and Johnson

Opened
  
16 January 2011

Width
  
7.35 m

Body of water
  
Jaffna Lagoon

Sangupiddy Bridge

Carries
  
Motor vehicles on the A32 highway

Locale
  
Sangupiddy, Kilinochchi District/Karaitivu, Jaffna District

Maintained by
  
Road Development Authority

Address
  
Navathkuli - Karativu - Mannar Highway, Sri Lanka

Owner
  
Ministry of Ports and Shipping

Similar
  
Naguleswaram temple, Navatkuli, Jetwing Jaffna, Ketheeswaram temple, Jaffna Fort

How look sangupiddy bridge sri lanka road a32


Sangupiddy Bridge (Changkupiddy Bridge) is a road bridge across Jaffna Lagoon in northern Sri Lanka. It connects Sangupiddy in Kilinochchi District to Karaitivu in Jaffna District. It is one of only two road bridges connecting the densely populated Jaffna Peninsula with the mainland.

Contents

Jaffna poonakary new sangupiddy bridge road video


History

In July 1932, during British colonial rule, plans were drawn up to build a causeway (the Mahadeva Causeway) across the shallow waters of the Jaffna lagoon, linking Sangupiddy, near Poonakari, with Karaitivu, near Navatkuly. The plans weren't implemented fully due to protests from local fishermen and salt producers. The partially built causeway was nevertheless used by locals until the civil war prevented them doing so.

In December 2009, following the end of the civil war, plans were drawn to build a bridge on the site of the causeway. The Sri Lankan Ministry of Ports and Highways had ordered an Atlas type bridge from British company Mabey and Johnson for the flyover at the Panadura junction in Colombo but the bridge was instead used for the Sangupiddy Bridge. Construction began in April 2010, with erection of 7-span bridge commencing in September 2010. Construction was carried out by Access Engineering, a Sri Lankan company. The bridge was completed in eight months. The bridge was formally opened on 16 January 2011.

The two lane bridge is 288m long and 7.35m wide. It consists of a steel girder structure and an ante steel deck system sitting on a reinforced cement concrete structure with pile foundations. The bridge cost 1.037 billion rupees (US$9.4 million) and was financed by a soft loan from the British Government's Steel Bridge Program.

The bridge is part of the A32 Jaffna-Mannar highway. Prior to construction of the bridge the only road connection between Jaffna Peninsula and the mainland was at Elephant Pass. Sangupiddy Bridge reduces the journey from the southern Sri Lanka to Jaffna by 110 km (68 mi) or three hours.

References

Sangupiddy Bridge Wikipedia