Supriya Ghosh (Editor)

Rodgau Railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Native name
  
Rodgaubahn

Locale
  
Opened
  
30 September 1896

Rolling stock
  
Status
  
Operational

Stations
  
12

Owner
  
Rodgau Railway wwwschrankenpostendeServiceRodgau100141jpg

Type
  
Heavy rail, Passenger railCommuter rail

Line number
  
Termini
  
Offenbach (Main) Hauptbahnhof

The Rodgau Railway (German: Rodgaubahn) is a railway line that runs from Offenbach Central Station (Offenbach am Main Hauptbahnhof) via Rodgau to Rödermark-Ober-Roden in the German state of Hesse. The name Rodgaubahn is derived from the medieval name of Rodgau, part of the former Maingau (Main district), which the line passes through for its whole length.

Contents

History

Since about 1870 there were serious proposals from local interest groups for the building of a railway to open up the Rodgau, but at first the government of the Grand Duchy of Hesse did not respond to them. An Eisenbahncomitée (railway committee) was formed after the first, unsuccessful initiative in 1877. But this took four years to get a response from Darmstadt, the capital of the Duchy, during which the committee carried out preparatory work for an Offenbach–Reinheim railway project at its own expense. It took until 1888 before the government gave final approval and after further discussions about the connection of the railway in Offenbach with the Prussian state railways in 1895, planning permission was granted. It was decided that the line would have its own station in Offenbach south of the Prussian state railways' station. The line was built by the Grand Duchy of Hesse State Railways. On 30 September 1896, the new line (now line number 3661) was opened from Offenbach via Dieburg to Reinheim with a length of 42.2 kilometres.

In the following years the Rodgau Railway was connected to two other railways:

  • On 1 December 1898, a branch line was opened from Offenbach-Bieber, the Offenbach-Bieber–Dietzenbach railway.
  • On 1 April 1905, a connection was opened in Ober-Roden to the new Dreieich railway (Dreieichbahn) from Buchschlag.
  • In 1923, the railway was built on an embankment in the city of Offenbach in order to remove level crossings with streets. This involved the rebuilding of the central station in Offenbach as a single station and the abandonment of the Rodgau Railway’s own station.

    Operations

    Initially, four pairs of trains operated daily. After the connection of the Dreieich Railway, there were only two pairs of through trains between Offenbach and Dieburg. The first trains were steam hauled; after the Second World War trains were increasingly hauled by diesel locomotives. The importance of the connection lay in the growing commuter traffic from the district of Offenbach, especially for those working in the leather goods industry in Offenbach.

    On 28 May 1965, the line between Dieburg and Reinheim was closed for passengers, partly because of the operation of the parallel bus route. In 1967, this section of the line was dismantled, beginning with the section between Dieburg and Groß-Zimmern. Freight trains ran to and from the Odenwald Railway (Odenwaldbahn) over the Darmstadt Ost–Groß-Zimmern railway until it was closed in 1970. In 1989, the remaining section of the line to Reinheim was closed.

    S-Bahn

    The establishment of an S-Bahn operation on the track was considered in the late 1950s. It was not, however, until 23 March 2001 that the line to Dietzenbach began to be reconstructed as a double-track electrified line of the Frankfurt S-Bahn network. In the course of the development work, 13 stations were modernised and two rebuilt. 15 bridges were rebuilt and 18 level crossings were secured with new barrier systems.

    S-Bahn operations began on the Rodgau line at the beginning of the 2003/2004 timetable on 14 December 2003. The line is operated by DB Regio as part of the Rhine-Main S-Bahn network as line S 1 (Wiesbaden–Ober-Roden), the northern section of the line is also used by line S 2 (Niedernhausen–Dietzenbach). Proposed extensions of line S1 to Dieburg and S2 to Ober-Roden failed as they was found not to be economically justified. Therefore, the section from Ober-Roden to Dieburg has not been electrified. This section of the line is now operated as part of the Dreieich Railway from Buchschlag.

    Remaining level crossings

  • Offenbach, Waldhofstr.
  • Obertshausen, Badstr.
  • Weiskirchen, Aigesweg
  • Nieder-Roden, Krümmlingsweg
  • Rollwald, Haltepunkt
  • Ober-Roden, Kläranlage
  • Ober-Roden, Dieburger Str. (full barriers with LZA)
  • Heusenstamm
  • Patershäuser Weg near Heusenstamm
  • All the level crossings are EBÜT equipped.

    References

    Rodgau Railway Wikipedia


    Similar Topics