Richborough Energy Park is a site of non-traditional power generation, on the site of the former Richborough power station close to the mouth of the River Stour near Sandwich, on the east coast of Kent.

Contents

Site history

The original Richborough power station operated from 1962 to 1996, with final demolition being undertaken in 2012. It originally burnt coal, but later converted to oil and that to the burning of Orimulsion.

The station was also the site of an experimental wind turbine in 1989, which at 1MW was the biggest then installed anywhere in the United Kingdom.

Current use

The national grid interconnector from the original power station is still in place, and is now the grid link for the offshore Thanet Wind Farm.

Plans

The current owner of the site, BFL Management Ltd, plan to bring the site back into use as a £750 million green energy park. There are additional plans to create additional recycling and green energy facilities on site, including an anaerobic digester, a waste processing plant, a biomass combined heat and power generator, a pyrolysis plant and a peak demand 30MW diesel generator. When fully operational, the park could provide up to 1,400MW of power, employing 100 full-time equivalent, with up to 500 jobs in the construction phase.

The site is the proposed landing site for a 1,000 MW power cable from Belgium called Nemo Link.

References