Rail transport in Thailand

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
National railway
  
SRT

Major operators
  
BTSC, BMCL

Infrastructure company
  
SRT

Ridership
  
?

Rail transport in Thailand

Total
  
4,346 kilometres (2,700 mi)

Electrified
  
80.55 km (50.05 mi) (rapid transit)

The railway network of Thailand is managed and operated by the State Railway of Thailand (SRT).

Contents

History

Interest in rail transport in Siam can be traced to when King Rama IV was given a gift of a model railway from Queen Victoria in 1855. The first railway line, 20 km in length, named the Paknam Railway between Bangkok–Samut Prakan began construction in July 1891 under a 50-year concession with a Danish company. Paknam Railway opened in 1894. This railway line was electrified in 1925, made it into the first electric railway service of Southeast Asia. This railway line was decommissioned on 1 January 1957.

Royal State Railways of Siam (RSR) was found in 1890 at the same time with a construction of the Bangkok-Ayutthaya railway (71 km or 44 mi), the first part of the Northern Line, was started in 1891 and opened on 26 March 1895. The Thonburi-Phetchaburi line (150 km or 93 mi), later the Southern Line, opened on 19 June 1903.

The Northern Line was originally built as 1,435 mm (4 ft 8 12 in) standard gauge, but in September 1919 it was decided to standardize on 1,000 mm (3 ft 3 38 in) metre gauge and the Northern Line was regauged during the next ten years. On 1 July 1951, RSR changed its name to the present State Railway of Thailand (SRT).

In 2005 SRT had 4,070 km (2,530 mi) of track, all of it metre gauge. Nearly all is single-track, although some important sections around Bangkok are double or triple-tracked and there are plans to extend this.

On 21 March 2015 Prime Minister Gen Prayut Chan-o-cha said that Thailand and China had signed a memorandum of understanding (MoU) in late-2014 on joint railway construction furthering Thailand's seven-year strategy on the development of transportation from 2015-2022. The MoU stipulates that a joint Thai-Chinese 1.435 metre standard-gauge rail network project bear fruit in 2018. Thailand is to be responsible for conducting environmental impact assessments and land expropriations. China is responsible for project design and construction. The project includes four routes: 133 km between Bangkok and Kaeng Khoi; 246.5 km between Kaeng Khoi and Map Ta Phut; 138.5 km between Kaeng Khoi and Nakhon Ratchasima; and 355 km from Nakhon Ratchasima to Nong Khai.

Issues

The SRT has long been popularly perceived by the public as inefficient and resistant to change. Trains are usually late, and most of its equipment is old and poorly maintained. The worst financially performing state enterprise, the SRT consistently operates at a loss despite being endowed with large amounts of property and receiving large government budgets; it reported a preliminary loss of 7.58 billion baht in 2010. Recurring government attempts at restructuring and/or privatization throughout the 2000s have always been strongly opposed by the union and have not made any progress.

Only two percent or less of Thailand's freight is transported by rail, despite rail being roughly half the cost of road transport and cleaner environmentally.

Operators

All intercity rail transportation is managed by the State Railway of Thailand, a government agency responsible for rail infrastructure investment as well as freight and passenger services.

In Bangkok, the Skytrain is operated by Bangkok Mass Transit System Public Company Limited (BTSC) under a concession granted by the Bangkok Metropolitan Administration (BMA) but the investment for the structure and system were fully supported by BTSC.

The underground system is operated by Bangkok Metro Company Limited (BMCL), while whole project investments were shared by Mass Rapid Transit Authorities (MRTA) and BMCL, which all civil structures was provided by government sector and the system was provided by private sector (BMCL). The deal of contract between BMCL and MRTA are under the concession agreement for 25 years operation.

Network

Thailand has 4,431 kilometres of metre gauge railway tracks not including mass transit lines in Bangkok. All national rail services are managed by the State Railway of Thailand. The four main lines are the Northern Line, which terminates in Chiang Mai, the Northeastern Line, which terminates at Ubon Ratchathani and the Lao border in Nong Khai Province, the Eastern Line, which terminates at the Cambodian border in Sa Kaeo Province, and the Southern Line, which terminates at the Malaysian border in Songkhla and Narathiwat Provinces.

  • Malaysia - yes - same 1,000 mm (3 ft 3 38 in) gauge
  • Laos - yes - 1,000 mm (3 ft 3 38 in) gauge across Mekong River on Thai-Lao Friendship Bridge
  • Cambodia - yes - disused (being rebuilt)
  • Myanmar - no - defunct - (see Death Railway). But projected extension will rebuild the route.
  • Rail transport in Bangkok

    In the late 1800s and early 1900s, King Rama V eagerly built a tram network for Bangkok by employing foreign engineers and technicians, especially Danish engineers. In fact, Bangkok had electric trams before Copenhagen. However, due to a lack of interest and maintenance the tram network was completely scrapped in 1968.

    Rapid transit systems

    Bangkok is currently served by three rapid transit systems: the BTS Skytrain, the MRT and the Airport Rail Link. Although proposals for the development of rapid transit in Bangkok had been made since 1975, leading to plans for the failed Lavalin Skytrain, it was only in 1999 that the BTS finally began operation.

    In addition to rapid transit and heavy rail lines, there have been proposals for several monorail systems, the most notable being a line linking Chulalongkorn University with Siam Square, to be funded by the BMA. In 2010 Grand Canal Land Company proposed a 600–800 metre line linking its properties on Rama IX Road with the Phra Ram 9 MRT Station, but failed to secure approval.

    The Mass Rapid Transit Master Plan in Bangkok Metropolitan Region has plans for the following rapid transit lines:

    Development is divided into three stages, in addition to those lines already open or under construction:

    Note: * Exclude BMA Monorail

    BTS Skytrain

    The BTS Skytrain uses two variations of Electric Multiple Unit rolling stock. All operate on 1,435 mm (4 ft 8 12 in) track gauge (standard gauge). All trains have 4 doors on each side per car, an air-conditioning unit, and LCD monitors for public announcement and advertising. The power supply for all trains is at 750 V DC from the third rail.

    Bangkok MRT

    The Bangkok MRT consists of two lines: the Blue Line and Purple Line: each train consists of two motor cars and a centre trailer car.

    Siemens supplied nine Desiro Class 360/2 trainsets. The only significant difference from the UK units is a much larger air-conditioning pod on the roof, providing extra power to cope with the Thai climate. City services is operated by five three-car trains, and the Express services by four trainsets with a fourth car for check-in baggage. The first trains left Germany in September 2007, and testing in Bangkok began in March 2008. On 15 May 2012 the Thai Cabinet approved a budget of 5.2 billion baht for the SRT to order 7 new, 4 car sets of Siemens Desiro rolling stock to be delivered by 2014. However, as of June 2013 no order for new rolling stock had yet been placed. The Ministry of Transport was considering purchasing cheaper Chinese (CNR) or Spanish (CAF) rolling stock which would require changing the Siemens closed signalling system to an open system.

    Tracks

    Most existing SRT lines use metre gauge, although standard gauge is used of rapid transit lines. As of 2013, approximately 4,346 km (2,700 mi) of track was in use throughout Thailand:

  • 4,346 km (2,700 mi) metre gauge (1,000 mm (3 ft 3 38 in));
  • 80.55 km (50.05 mi) standard gauge (1,435 mm (4 ft 8 12 in)); and
  • Railway stations

    About 450 stations.

    Bridges

    About 1,000 bridges.

    Level crossings

    The Thai rail network has 2,624 level crossings nationwide (2016). Many have no crossing barriers, making them common and frequent sites of accidents.

    Tunnels

    There are seven railway tunnels in Thailand, amounting to a total length of 3.63 km (2.26 mi).

    Level crossings

    The Thai rail network has 2,624 level crossings nationwide (2016). Many have no crossing barriers, making them frequent sites of accidents.

    Signalling

    SRT uses colour light signals and semaphore signal

    Future Plans

    Mass transit routes in Bangkok are also set to be expanded. Excluding the already under construction extensions to the Skytrain, the Bangkok Metropolitan Government is planning a northern as well as western expansion of the Skytrain. The Central Government, through the State Railway of Thailand and Mass Rapid Transit Authority of Thailand are also planning to build several new rapid transit routes.

    The Thai Government also has double tracking projects including a double tracking project in the works between Laem Chabang deep sea port and the Lad Krabang ICD. Also, in line with the Government's policy of reducing overall logistics costs in Thailand, there are plans to completely double track all the main lines in the country as well as upgrade track quality. The Government is also mulling a restructuring of the State Railway of Thailand and granting operating concessions to private freight operators. An international rail link has opened to Vientiane in Laos via Nong Khai and the Thai-Lao Friendship Bridge. The 6 km 'missing link' on the Eastern line between Aranyaphratet and Poipet (Cambodia) is also being rebuilt with construction starting in late 2013 for completion in 900 days.

    New SRT lines

    There are also plans to construct new railway routes:

  • 1) Chiang Rai in the north via Denchai Junction - 326 km, 77 billion baht. This route is currently under EIA evaluation
  • 2) Ban Phai (on the Northeast line) - Roi Et - Mukdahan - Nakhon Phanom - 347 km, 42 billion baht. (Completing public consultations & final route evaluation by Oct 2014)
  • 3) Kanchanaburi - Dewei (Burma): 190 km. Route to be finalised
  • 4) Phuket from Surat Thani
  • 5) Connect the Maeklong railway to main lines
  • Thailand High Speed Railways

    In October 2010, the Thai parliament approved initial proposals for a high speed rail (HSR) network. Five lines capable of handling 250 km/h speeds would radiate from Bangkok.

    In March 2013, the transport minister revealed that only one company would be selected to run all high-speed train routes, scheduled to be operational between 2018 and 2019. The first 86 km section from Bang Sue to Ayuthaya was planned to be tendered in late-2013. However, a seven-month-long political crisis involving the dissolution of parliament and an annulled February 2014 election culminated in a military coup in May 2014. Subsequently, in July 2014 the new military administration deferred all HSR plans until the next civilian government is installed.

    Following the military coup of May 2014 and his elevation to the office of prime minister, Gen Prayut Chan-o-cha proposed connecting Bangkok to two popular resort cities, Pattaya and Hua Hin, by high-speed rail. The Transport Ministry's Office of Transport and Traffic Policy and Planning had earlier conducted studies on both routes. They assumed that, for the Bangkok-Pattaya line, trains would run through Chachoengsao, Chonburi, and Pattaya, terminating in Rayong, a total distance of 193.5 km. Construction costs were estimated at 152 billion baht with an economic internal rate of return (EIRR) of 13 percent. Construction would take about 54 months. The route to Hua Hin would be 209 km in length with an investment cost of about 98 billion baht and EIRR of 8.1 percent. The office concluded that these routes would be of little interest to private investors due to the high investment required, coupled with a low rate of return.

    Bangkok-Chiang Mai Shinkansen

    Japan has proposed Shinkansen technology for a high-speed rail link between Bangkok and the northern city of Chiang Mai.

    In August 2016, according to the Transport Minister Arkom Termpittayapaisith, Thailand and Japan discussed a high-speed train to link Bangkok and Chiang Mai. Japan agreed to use the Shinkansen as its bullet train model.

    Sino-Thai railways

    China's dream is to construct a 3,000 km railway from Kunming to Singapore, traversing Laos, Thailand, and Malaysia. That plan is in jeopardy in the near-term.

    In November 2014, Thailand and China signed a memorandum of understanding agreeing to construct the Thai portion of the transnational railway running from Kunming, China to the Gulf of Thailand. In November 2015, both parties agreed to a division of labour. Under the framework, a joint venture would be set up to run the project. China would conduct feasibility studies, design the system, construct tunnels and bridges, and lay track. Thailand would conduct social and environmental impact studies, expropriate land for construction, handle general civil engineering and power supply, and supply construction materials.

    Once built, China would operate and maintain the system for the first three years of operation. Between the third and the seventh years, both countries would share responsibility. Later Thailand would take on responsibility with China as adviser. China would train Thai personnel to operate and maintain the system.

    Dual standard-gauge tracks would be laid throughout the project. In Thailand, two routes would diverge at a junction in Kaeng Khoi District in Saraburi Province. One to connect Bangkok to Kaeng Khoi. The other route to connect Kaeng Khoi with Map Ta Phut of Rayong Province. From Kaeng Khoi tracks would lead north to Nakhon Ratchasima and on to Nong Khai Province. Construction would be divided into four sections: Bangkok-Kaeng Khoi, Map Ta Phut-Kaeng Khoi, Kaeng Khoi-Nakhon Ratchasima, Nakhon Ratchasima-Nong Khai.

    Construction of Thailand's 873-kilometre-long portion of the railway system was expected to start in mid-2016 and take three years. It would connect to a 417 km line from Vientiane to the northern Lao border and a 520 km line from the Lao border to Kunming. Both the Thai and Lao portions of the route are on hold due to conflicts with the Chinese over funding and land disbursements.