Operator(s) NOMAC Phone +966 3 845 6795 Construction began 21 September 2011 | Status Under construction Construction cost 2.85 billion USD | |
![]() | ||
Location Qurayyah, Ash Sharqiyah Commission date June 30, 2014 (2014-06-30) Owner(s) Hajr Electricity Production Company Hours Open today ยท Open 24 hoursTuesdayOpen 24 hoursWednesdayOpen 24 hoursThursdayOpen 24 hoursFridayOpen 24 hoursSaturdayOpen 24 hoursSundayOpen 24 hoursMondayOpen 24 hoursSuggest an edit Similar JAL Internatio Co Ltd, JGC Gulf Internatio Co Ltd, Saipem, Energy & Power Contracti |
Gsut 5 qurayyah ipp
Qurayyah IPP (QIPP) is a large gas and fuel oil fired combined cycle power station currently under construction in Qurayyah, Saudi Arabia.
Contents
The project is being developed on a BOO (Build Own Operate) basis, with finance from international banks (HSBC, Standard Chartered, SMBC) and numerous local banks (Banque Saudi Fransi, National Commercial Bank, Samba, Arab National Bank, Saudi British Bank and Saudi Hollandi Bank).
Gsut 6 qurayyah ipp
Technology
The power station consists of six identical groups of equipment provided by Siemens, each with a net output of 654.5 MW. Each block has a 2+2+1 configuration consisting of two SGT6-5000F Combustion Turbines, two Heat Recovery Steam Generators, and one SST6-4000 Steam Turbine. At 52%, it is the most efficient power station of its kind in the country, and one of the largest in the world, at 3,927 MW.
Shareholders
The shareholder structure of Hajr Electricity Production Company is as follows:
EPC contractor
Samsung C&T Corporation has been appointed as EPC contractor.
Milestone dates
LNTP (Limited Notice to Proceed): June 1, 2011
Contract Signing: September 21, 2011
Financial Close: April 26, 2012
PCOD (Project Commercial Operation Date): June 30, 2014