Project High Wire was a United States Air Force modernization programme for selected North American Aviation F-100Cs, Ds and Fs Super Sabre that were still in active inventory. It consisted of two detailed modification groups: significant electrical rewiring upgrade, and heavy aircraft maintenance and IRANi upgrade. These upgrades began in 1962.
Rewiring upgrade operation consisted of replacing old wiring and harnesses with improved maintainable designs. Heavy maintenance and IRAN included new kits, modifications, standardized configurations, repairs, replacements and complete refurbishment.
Source: USAF F-100C Super Sabre - Flight Manual - Technical Order Upgrades T.O. 1F-100C(I)-1S-65 2 February 1971A modification program of changes in maintenance procedures, major wiring harnesses, IRANi upgrade, and additional avionics.
Improved nose gear ground safety lock instructionsImproved use of 200 US gal (760 L). drop tanks and installation on outboard pylonsRestriction on takeoff with partially filled 450 US gal (1,700 L). drop tanksImproved use of braking system with thermal expansion after high altitudes to prevent excessive pressures and system failures.Improve instructions on all ejection seat systems at low altitude bailoutsA modernization programme of 3 simultaneous operations: an electrical rewiring operation, and a heavy maintenance improvements and IRAN operations. Also including design changes, safety instructions, aircraft characteristics, normal and emergency operations, and overall aircraft and documentation standardization.
List of changes and rescinded(R)Loose strap end securingMain gear tire failure landingsg limitations - RSpin recovery and canopy warning lightAdditional information on external store index systemOxygen mask hose reroutingWarning light on fuel shutoff switch – RAdditional loading configuration for Mk-82 and Snakeye I (Mk-82 w/drag fins) bombs"CAUTION" note on tail skidIn-flight refueling ready lightAddition stores index numbersLanding pattern usageA/A37U-15 Tow Target index numbersTurn-and-slip indicator informationAdditional store informationStore index numbers for MK-82 bomb with 36-inch (910 mm) fuze extenderStore index numbers for Destructor M117DDispensing of C/B munitions – RStore index numbers airspeed limits for CBU-24Bomb arming switch informationSalvo of armed bombsFlight limits for BLU-52/B bomb (chemical)BLU-32/B Fire Bomb un-finnedModification of oil pressure relief valveInformation of AIM-9E air-to-air missile90 degree rotation of A/ARC-34Information of SUU-20/A Practice DispenserRelocation of sight selector unitInstallation of data recording systemHigh stresses in the N2 Compressor of the J57-21, -21A enginesInstallation of 450 US gal (1,700 L). air refueling drop tanks and gaugesInstallation of in-flight refueling probe extensionInstallation of AIM-9B provisionsInstallation of true airspeed indicatorProvisions for in-flight refueling of external tanksInstallation of EPR systemInstallation of ILS AN/ARN-31 systemRemoval of supplementary oil tankStandardization of takeoff trim setting90 degree rotation of AN/ARC-34installation of canopy breakaway toolmodification of dispenser and rocket systeminstallation of variable intensity light controlautomatic electrical caging – A-4 sightdeactivation of attitude indication system during ground maintenanceinstallation of fuel system shutoff valve fail lightinstallation of relay in gun camera circuitryinstallation of exterior floodlightsinstallation of data recording equipmentinstallation of cockpit selectable hi-lo drag bomb capabilityinstallation of anticollision lightsrelocation of variable rocket depression unitautomatic throttle positioning in case of throttle linkage failuremodification of fuel control and addition of extended range afterburnermodification of engine fuel pump transfer valvemodification of oil pressure relief valveInformation on arresting systems and approach end engagementsInformation of fuel system shutoff valveFlight limits on SUU-20/A practice dispensers with BDU-33/B, -33A/B, -33B/B bombsInformation on SUU-20 seriesInformation on LAU-3 Rocket LauncherOperating procedures on HBU-2B/A Lap BeltInformation on minimum altitude of attempting an air startInformation on wind-blast injury during ejectionsHigh stresses in the N2 CompressorInformation on pitch damper system deactivationInformation on partially filled 355 US gal (1,340 L). and 275 US gal (1,040 L). drop tanksProject High Wire modifications were extensive and dictated a change in the block number assignment, i.e.: F-100C-10-NH to F-100C-11-NH
Block No.s.......
S/N Range......................
Block number changeF-100C-1-NA .... AF 53-1709 to –1778 ... F-100C-2-NAF-100C-6-NA .... AF 54-1770 to –1814F-100C-11-NH ... AF 55-2709 to –2733F-100C-16-NA ... AF 54-1615 to –1859F-100C-21-NA ... AF 54-1860 to –1969F-100C-26-NA ... AF 54-1970 to –2120
Note: NA – Los Angeles, CA and NH – Columbus, OH
F-100Ds and Fs
Source: USAF F-100D,F Super Sabre - Flight Manual - Technical Order: 1F-100D(I)-1S-120 dated 12 January 1970This project required all new manuals (TOs)a and incremented (i.e. -85 to -86) block numbers. All later production models, especially the F models included earlier High Wire mods. New manuals included colored illustrations. All manuals will have the Roman numeral (I) added after the aircraft number (i.e. T.O. 1F-100D(I)-1S-120, 12 January 1970
Approximately 700 D-models had been modified with Project High Wire.
This upgrade is to provide aircrew information on aircraft for installation of Data recorder (DR) equipment. DR is to record basic information on flight conditions i.e., velocity, G-force, and altitude. This data will be used to study the results of various mission requirements and determine the effects on the fatigue life of the aircraft structures:
VGHb A/A24U-10 RecorderMagnetic tape mediaRecords during gun firing, store release, in-flight refueling, change in nose gear load switch positionPowered by the primary busTRK-77/A24U AccelerometerVGH REC/LDG POS CONTROL, no cockpit controlsIncludes previous T.O. -1S-nnn
supplemental upgrades, as nnn
listed below:-119 Relocation of Sight Selector Unit and relocation of Variable Rocket Depression Unit-118 Information on ECM Pod QRCc-160-8 (AN/ALQ-87)-117 Information on variety of ordnance and special stores-116 Classified-115 For F-100Fs-114 Classified-112 Modified Oil Pressure Relief Valve for J-57-111 Relocation of Fuel Boost Pump and test switch-110 CBU-42/A authorization-109 BLU-32/B Firebomb Unfinned-108 Information on CBU-37/A31 August 1967 - 15 December 1969A modernization programme of 2 simultaneous operations: an electrical rewiring operation, and a heavy maintenance improvements and IRAN operations. Also including design changes, safety instructions, aircraft characteristics, normal and emergency operations, and overall aircraft and documentation standardization. List of changes and rescinded(R):
Loose strap end securingMain gear tire failure landingsG limitations - RSpin recovery and canopy warning lightAdditional information on external store index systemOxygen mask hose reroutingWarning light on fuel shutoff switch - RAdditional loading configuration for MK-82 and Snakeye I BombCAUTION note on tail skidIn-flight refueling ready lightAddition stores index numbersLanding pattern usageA/A37U-15 Tow Target index numbersTurn and slip indicator informationAdditional store informationStore index numbers for MK-82 with 36-inch (910 mm) Fuse ExtenderStore index numbers for Destructor M117DDispensing of C/B munitions - RStore index numbers airspeed limits for CBU-24Bomb arming switch informationSalva of armed bombsFlight limits for BLU-52/B bombBLU-32/B Fire Bomb un-finnedModification of oil pressure relief valveInformation of AIM-9E air-to-air missile90 degree rotation of A/ARC-34Information of SUU-20/A Practice DispenserF-100 "G" restrictionsHigh stresses in the N2 Compressor of the J57-21, -21A enginesInstallation of 450 US gal (1,700 L). air refueling drop tanks and gaugesInstallation of in-flight refueling probe extensionInstallation of AIM-9B provisionsInstallation of true airspeed indicatorProvisions for in-flight refueling of external tanksInstallation of EPR systemInstallation of ILS AN/ARN-31 systemRemoval of supplementary oil tankStandardization of takeoff trim setting90 degree rotation of AN/ARC-34installation of canopy breakaway toolmodification of dispenser and rocket systeminstallation of variable intensity light controlautomatic electrical caging - A-4 sightdeactivation of attitude indication system during ground maintenanceinstallation of fuel system shutoff valve fail lightinstallation of relay in gun camera circuitryinstallation of exterior floodlightsinstallation of data recording equipmentinstallation of cockpit selectable hi-lo drag bomb capabilityinstallation of anticollision lightsrelocation of variable rocket depression unitautomatic throttle positioning in case of throttle linkage failuremodification of fuel control and addition of extended range afterburnermodification of engine fuel pump transfer valvemodification of oil pressure relief valveInformation on arresting systems and approach end engagementsInformation of fuel system shutoff valveFlight limits on SUU-20/A practice dispensers with BDU-33/B, -33A/B, -33B/B bombsInformation on SUU-20 seriesInformation on LAU-3 Rocket LauncherOperating procedures on HBU-2B/A Lap BeltInformation on minimum altitude of attempting an air startInformation on wind-blast injury during ejectionsHigh stresses in the N2 CompressorInformation on pitch damper system deactivationInformation on partially filled 355 US gal (1,340 L). and 275 US gal (1,040 L). drop tanksD-model High Wire modifications were also performed on A-models and previously upgraded C-models. Most D-model modifications mandated the change in the block number of the aircraft; thus increasing the block number by one unit value, i.e.: F-100D-10-NH to F-100D-11-NH.
Serial Number Information:
Block No.s......
S/N Range......
Block number changeYF-100A-NA....52-5754/55F-100A-01-NA 52-5756 ~ 5765F-100A-05-NA 52-5766 ~ 5778F-100A-10-NA 53-1529 ~ 1568F-100A-15-NA 53-1569 ~ 1608F-100A-20-NA 53-1609 ~ 1708F-100C-01-NA 53-1709 ~ 1778..F-100C-02-NA (See F-100C High Wire Descriptions)F-100C-05-NA 54-1740 ~ 1769..F-100C-06-NAF-100C-10-NA 54-1770 ~ 1814..F-100C-11-NAF-100C-15-NA 54-1815 ~ 1859..F-100C-16-NAF-100C-20-NA 54-1860 ~ 1970..F-100C-21-NAF-100C-25-NA 54-1971 ~ 2120..F-100C-26-NAF-100C-10-NH 55-2709 ~ 2733..F-100C-11-NAF-100D-01-NA 54-2121 ~ 2132F-100D-05-NA 54-2133 ~ 2151F-100D-10-NA 54-2152 ~ 2221F-100D-15-NA 54-2222 ~ 2303F-100D-20-NA 55-3501 ~ 3601F-100D-25-NA 55-3602 ~ 3701..F-100D-26-NAF-100D-30-NA 55-3702 ~ 3814..F-100D-31-NAF-100D-35-NH 55-2734 ~ 2743F-100D-40-NH 55-2744 ~ 2783F-100D-45-NH 55-2784 ~ 2863..F-100D-46-NAF-100D-50-NH 55-2864 ~ 2908..F-100D-51-NAF-100D-55-NH 55-2909 ~ 2954..F-100D-56-NAF-100D-60-NA 56-2903 ~ 2963..F-100D-61-NAF-100D-65-NA 56-2963 ~ 3022..F-100D-66-NAF-100D-70-NA 56-3023 ~ 3142..F-100D-71-NAF-100D-75-NA 56-3143 ~ 3198..F-100D-76-NAF-100D-80-NH 56-3351 ~ 3378..F-100D-81-NAF-100D-85-NH 56-3379 ~ 3463..F-100D-86-NAF-100D-90-NA 56-3199 ~ 3346..F-100D-91-NAF-100F-01-NA 56-3725 ~ 3739..F-100F-02F-100F-05-NA 56-3740 ~ 3769..F-100F-06F-100F-10-NA 56-3770 ~ 3919..F-100F-11F-100F-15-NA 56-3920 ~ 4019..F-100F-16..(~4016)____________58-6975 ~ 6983____________59-2558 ~ 2563F-100F-20-NA 58-1205 ~ 1233..F-100F-21
Total Production 2,294
Note: NA - Los Angeles, CA and NH - Columbus, OH