Portside Tower

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Commercial

Town or city
  
Cape Town

Completed
  
2014

Floors
  
30

Address
  
5 Buitengracht Street

Country
  
South Africa

Height
  
136 m

Opened
  
2014

Portside Tower httpsuploadwikimediaorgwikipediacommonsthu

Cost
  
R1.6 Billion (estimated)

Owners
  
Baker Street Properties, Accelerate Property Fund, FirstRand

Similar
  
Metlife Centre, 1 Thibault Square, 88 on Field, Mutual Building, Michelangelo Towers

Portside tower commercial space hd


Portside is a 131 metre tall building in Cape Town, South Africa. Completed in 2014, it is the city's tallest building and at the time of completion, was Cape Town's first significant skyscraper developed in the central business district (CBD) in 15 years.

Contents

Map of Portside Tower, Cape Town City Centre, Cape Town, 8001, South Africa

The property is jointly owned by FirstRand Bank (FNB, RMB, Wesbank and Ashburton) and Accelerate Property Fund. The bank self-occupies its share of the property, while Accelerate Property Fund is leasing office-and retail space to tenants. Accelerate Property Fund appointed Cape Town-based commercial brokerage firm Baker Street Properties to manage and market the property.

The Green Building Council of South Africa (GBCSA) awarded the property a 5 star Green Star rating, making it the tallest Green Building in South Africa.

Portside tower construction time lapse june 2012


Conception

In 2008 it was initially proposed that the building include a hotel and be 147.6m above sea level. However, due to the Late-2000s recession and difficulties around securing a hotel management contact the project was put on hold for almost three years and the design was altered.

During the design and planning phase, and after extensive public participation, it was decided to keep the building below a certain height so as not to obscure the view of Table Mountain. The tower will have over 51,500 m2 of office space with remaining space being used for over 1,382 parking bays and retail outlets.

The building was designed to use low energy technology throughout and is the first large building in South Africa to use almost exclusively LED lighting. The building has been awarded a five star Green Star rating from the Green Building Council of South Africa as compliant technologies have been specified throughout.

Construction

Construction work on the tower began on the 12 August 2011. In late March 2013 construction was temporarily halted by the City of Cape Town's disaster response unit due to strong gale force winds making the scaffolding unstable.