Rahul Sharma (Editor)

Porth railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Porth

Station code
  
POR

DfT category
  
D

Opened
  
1876

Number of platforms
  
2

Grid reference
  
ST025913

Managed by
  
Arriva Trains Wales

2011/12
  
0.298 million

Local authority
  
Rhondda Cynon Taf

Original company
  
Taff Vale Railway

Porth railway station

Address
  
Porth CF39 9SR, United Kingdom

Similar
  
Trehafod railway station, Pontypridd railway station, Llanbradach railway station, Llwynypia railway station, Tonypandy railway station

Porth railway station is a railway station serving the town of Porth in Rhondda Cynon Taf, Wales. It is located on the Rhondda Line.

Contents

History

Two stations have served Porth. The first was opened on 4 February 1861 by the Taff Vale Railway; the line had been open since 10 June 1841.

On 1 July 1876, the original station was closed, being replaced by a new one approximately 240 yards (220 m) to the east. The Rhondda Fawr line to Treherbert was singled north of here in 1981 and most of the 1876 station buildings were replaced in 1984–85.

The now defunct Maerdy Branch along the Rhondda Fach valley to Maerdy and the collieries at Mardy and Ferndale used to diverge from the 'main line' to Treherbert just north of the station at Maerdy Junction. Opened in stages between 1849 and 1856, the passenger service over this route ended in 1964, but mineral traffic to Mardy Colliery continued to run until final closure of the branch in August 1986, when coal from Mardy was then raised from Tower Colliery. The track was subsequently lifted in 1996, but the old formation can still be traced (along with the former up loop platform used by branch trains).

A passenger service between Porth and Barry was introduced by the Barry Railway on 16 March 1896, running via Pontypridd Graig and Treforest High Level., but this ended in 1930 when the service was re-routed via the TVR station at Pontypridd (trains henceforth terminating there, except for summer excursions, until the service down to Barry finally ended in September 1962).

An unusual ground level signal box was installed at the station when the Treherbert line was reduced to single track in 1981, replacing a much more substantial TVR structure. This holds the distinction of the being the last new mechanical box to be built by British Rail, though it had a working life of only 17 years before being abolished in 1998 when the Radyr signalling centre took control of the area.

Services

Monday-Saturday, there is a half-hourly service to Cardiff Central via Pontypridd and Cardiff Queen Street southbound and to Treherbert northbound, serving all stations en-route except Trefforest Estate. This drops to hourly in the late evening. There is a two-hourly service in each direction on Sundays, with through trains to Barry Island.

References

Porth railway station Wikipedia


Similar Topics