Playford B Power Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Australia

Primary fuel
  
brown coal

Operator
  
Alinta

Commission date
  
1963

Nameplate capacity
  
240 MW

Units operational
  
0

Location
  
Port Paterson, South Australia

Similar
  
Cathedral Rocks Wind Farm, Canunda Wind Farm, Hallett Wind Farm, Clements Gap Wind Farm, Wonthaggi Wind Farm

Playford b power station in port augusta


Playford B Power Station was located at Port Paterson in the Australian state of South Australia about 5.5 kilometres (3.4 mi) south of the city centre of Port Augusta. It was coal powered with four 60 MW steam turbines that generate a total of 240 MW of electricity. Playford B received coal by rail from the Leigh Creek Coal Mine, 280 km to the north and draws cooling water from Spencer Gulf, returning it to the sea at an elevated temperature. Commissioned in 1963, it was co-located with the larger, newer Northern Power Station. Playford B was mothballed in 2012 and its permanent closure was announced by operator Alinta Energy in October 2015. Prior to being mothballed it primarily operated in the summer, when electricity demand peaks.

Contents

Air

Carbon Monitoring for Action estimates this power station emits 1.77 million tonnes of greenhouse gases each year as a result of burning coal. The Australian Government has announced the introduction of a Carbon Pollution Reduction Scheme commencing in 2010 to help combat climate change. It is expected to impact on emissions from power stations. The National Pollutant Inventory provides details of other pollutant emissions, but, as at 23 November 2008, not CO2.

Marine

The draws seawater from Upper Spencer Gulf for cooling. It is discharged back into the Spencer Gulf 6.6 °C warmer than the original intake water temperature. The rate of flow is 14.5 m³ per second. In addition to thermal pollution, other marine discharges include (from greatest to smallest): fluoride, boron, arsenic, manganese, chromium, copper, nickel and mercury.

Closure

The plant was mothballed in 2012 with Alinta Energy citing 'market conditions'. Though not stated explicitly, the primary causes are likely to be flat or declining demand and increasing penetration of renewables such as wind and rooftop solar PV. In the financial year 2012-13, the plant did not generate electricity but was in a status of active storage, on a potential 90-day recall. No emissions were reported to the National Pollution Inventory that year.

With the closure of Playford B imminent the Australian government came under pressure from the local community through a community vote and a national campaign to replace Playford and eventually Northern with concentrated solar thermal power generation technology. This campaign has brought together diverse groups including the Australian Youth Climate Coalition under the name Repower Port Augusta.

On 11 June 2015, Alinta Energy announced their intent to permanently close the power station by March 2018, along with the related Northern Power Station, and the Leigh Creek coal mine that supplies them both with fuel.

On 30 July 2015, Alinta Energy announced they were bringing the closure dates of all three facilities forward by 12 months, and now intended to no longer operate them past March 2017 and could shut them down as early as March 2016. This was updated on 30 July 2015 to bring the closure dates of all three facilities forward by 12 months, with closure to occur between March 2016 and March 2017.

On 7 October 2015, Alinta Energy announced the permanent closure of Northern and Playford B around 31 March 2016, effectively meaning that Playford B would never re-open. In January 2016, Alinta announced that the closure date had been set back to 8 May 2016 and the Northern Power Station was shut down on the 9th of May. Demolition of both stations and site remediation work was expected to take 18 to 24 months to complete.

Fly ash playa and health concerns

With the permanent closure of the Playford B and Northern power stations at Port Augusta, dampening flows of water across the adjacent fly ash playa ceased. This allowed the fly ash, which contains crystalline silica, to become airborne. On several occasions in 2016 and 2017, plumes of the fine grey fly ash powder became visible rising from power station site and blew into the town of Port Augusta, concerning residents and impacting air quality.

In February 2017, topsoil application trials were underway and liquid odour suppressant was being applied periodically to the flyash dam.

References

Playford B Power Station Wikipedia