Carries 4 lanes of US 98 ID number 480035 Construction started 1960 Opened 13 June 1931 | Address Florida 32501, USA Total length 4,767 m Bridge type Girder bridge | |
![]() | ||
Official name Philip Dane Beall, Sr., Memorial Bridge Similar Escambia Bay Bridge, Garcon Point Bridge, St George Island Bridge, Memorial Bridge, Trammell Bridge |
Pensacola bay bridge us 98 part 1
The Pensacola Bay Bridge, also known locally as the Three-Mile Bridge, runs between downtown Pensacola, Florida, and Gulf Breeze, Florida. It carries four lanes of U.S. Highway 98 across Pensacola Bay.
Contents
- Pensacola bay bridge us 98 part 1
- Pensacola bay bridge redesign presentation
- History
- Replacement
- References
Pensacola bay bridge redesign presentation
History
The bridge, which is dedicated to Sen. Phillip D. Beall Sr., opened to traffic on October 31, 1960, at which time it replaced the Thomas A. Johnson Bridge, a narrow two-lane facility that ran parallel just to the east. This original bridge, which had been in service since June 13, 1931, was tolled and was signed as TOLL US 98 until the bridge bonds were paid off. The decommissioned original bridge served as two 1.5-mile-long fishing piers until they were largely destroyed by Hurricane Ivan in 2004. By 2007, the remainder of the northernmost fishing pier was demolished. Demolition has begun on the southernmost part of the fishing pier. In 2010, construction was completed on a northern replacement fishing pier about half as long as the original pier.
In 1989, the bridge was struck by a barge and was out of service for several months. All traffic was diverted to ferries, causing severe backups in both Gulf Breeze and downtown Pensacola. The Florida Department of Transportation took the opportunity to modernize the bridge, adding emergency lanes and replacing barrier walls and lighting.
Replacement
FDOT announced in January 2010, near the end of the bridge's 50-year design life, that the bridge was structurally deficient and would have to be replaced within six years. As of 2011, a study is underway to determine the "feasibility, location, and conceptual design" of a replacement bridge. As of February 2013, plans have begun to replace the bridge with construction beginning within two years, at a cost of $595.6 million, on a course slightly to the west of the existing bridge. The new bridge, like the current one, will not charge a toll.