Kalpana Kalpana (Editor)

Peetz Table Wind Energy Center

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
United States

Commission date
  
2001, 2007

Rotor diameter
  
80M

Owner
  
NextEra Energy Resources

Status
  
Operational

Type
  
Onshore

Opened
  
2001

Peetz Table Wind Energy Center

Location
  
Peetz, Colorado, Colorado

Similar
  
Panther Creek Wind Farm, Klondike Wind Farm, Buffalo Gap Wind Farm, Capricorn Ridge Wind Farm, PeƱascal Wind Power Pr

The Peetz Table Wind Energy Center was constructed in two phases. The first phase of the north-eastern Colorado wind project was completed in 2001 and brought 29.7 megawatts onto the grid. Project owner NextEra Energy Resources then added 400 MW's in 2007, bringing the total capacity to nearly 430 MW. Utilizing 33 NEG Micon turbines for phase 1 and 267 General Electric turbines for phase 2, the Peetz Table Wind Energy Center is one of the United States' largest wind projects.

In 2007, it was projected that the wind farm would have approximately 20 full-time employees when completed.

References

Peetz Table Wind Energy Center Wikipedia


Similar Topics