Peñascal Wind Power Project

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Nameplate capacity
  
404 MW

Units operational
  
168

Peñascal Wind Power Project wwwmortensoncommediaimagesprojectswindus

Official name
  
Peñascal Wind Power Project

Make and model
  
Mitsubishi Group, Mitsubishi Heavy Industries, Ltd.

Similar
  
Panther Creek Wind Farm, Buffalo Gap Wind Farm, Klondike Wind Farm, Capricorn Ridge Wind Farm, Tehachapi Pass Wind Farm

The 404 megawatt (MW) Peñascal Wind Farm is located in Kenedy County, Texas and was completed in April 2010 by Iberdrola.

The wind farm has 168 Mitsubishi MHI 92 wind turbines, each with a capacity of 2.4 MW. The facility created some 20 direct jobs in maintenance and operation of the wind farms. Around 200 people were involved in its construction. Iberdrola received a $114 million treasury grant for the project as part of the stimulus funds that was released in September 2009. On July 30, 2010, the U.S. Treasury's 1603 Program website listed the Penascal II Wind Project as having received a total award amount of $222,861,149.00.

The wind farm includes an innovative radar system that detects the arrival of large flocks of migratory birds and shuts down the turbines if visibility conditions present a danger.