Panipat Thermal Power Station I is located at Panipat in Haryana. The power plant is one of the coal based power plants of HPGCL
Power plant
The first four units was bifurcated from the total 8 units of the plant, so that to form Panipat Thermal Power Station I and II. Panipat Thermal Power Station I has an installed capacity of 447.80 MW. The First unit was commissioned in November 1979. In order to improve the performance of the all four units of the plant, the Renovation and Modernisation has been started.