Status Operational Opened 1930 Line length 238.49 km (148 mi) | Operator(s) South Central Railway Track length 130 km (81 mi) | |
![]() | ||
Terminis Macherla, Guntur Junction railway station |
The Pagidipalli–Nallapadu section is a single line section in Guntur railway division of South Central Railway.
Contents
History
The Guntur-Macherla section was opened in 1930. It was a Metre gauge line earlier. Later it was to converted Broad gauge. This line was used during the construction of Nagarjuna Sagar Dam.
Route
This route starts from Pagidipalli and passes through Nadikudi, Sattenapalle, Piduguralla and joins Nallapadu near Guntur.
References
Pagidipalli–Nallapadu section Wikipedia(Text) CC BY-SA