Supriya Ghosh (Editor)

Overlake Transit Center

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Owned by
  
Sound Transit

Structure type
  
Surface

Owner
  
Sound Transit

Bus stands
  
8

Opened
  
4 February 2002

Rebuilt
  
2023 (planned)

Overlake Transit Center

Location
  
15590 Northeast 36th Street Redmond, Washington United States

Train operators
  
Sound Transit (proposed)

Bus operators
  
King County Metro Sound Transit Express

Address
  
Redmond, WA 98052, United States

Similar
  
Bellevue Transit Center, South Bellevue station, Sumner station, Auburn station, Mercer Island station

Overlake Transit Center is a bus station and proposed light rail station in Redmond, Washington. The current bus station opened in 2002 and is located on the Microsoft Redmond Campus; it is served by Sound Transit Express and King County Metro.

Contents

In 2023, it will become the eastern terminus of the Sound Transit East Link light rail line and be renamed to Redmond Technology Center station.

Location

The Redmond Technology Center light rail station will be located adjacent to State Route 520 near its interchange with NE 40th Street.

A pedestrian bridge over State Route 520, connecting the station to the Microsoft west campus, was funded by Microsoft and the City of Redmond in 2013 and is anticipated to be completed in 2020.

History

The $8 million transit center, funded by Sound Transit, the City of Redmond, King County Metro, Microsoft and the Federal Transit Administration, opened on February 4, 2002. The new transit center initially lacked passenger shelters and a paved parking lot, which were added in May. The 10-acre (4.0 ha) site was donated by Microsoft, who also contributed $1.2 million to the project and added commuter bus and shuttle bus services.

References

Overlake Transit Center Wikipedia