Built by CORF | In use Abandoned | |
![]() | ||
Materials Concrete, steel, rock excavation Similar Ouvrage Monte Grosso, Ouvrage Flaut, Ouvrage Gordolon, Ouvrage Col de Restefond, Ouvrage Col de Garde |
Authion gros ouvrage plan caval ligne maginot
Ouvrage Plan Caval is a lesser work (petit ouvrage) of the Maginot Line's Alpine extension, the Alpine Line, also known as the Little Maginot Line. The ouvrage consists of two infantry blocks and one observation block facing Italy. The ouvrage is located on the heights of L'Authion, surrounded by older fortifications. Three additional blocks were planned to make it a gros ouvrage but were not built. Cost for the full ensemble was estimated at 23 million francs.
Contents
- Authion gros ouvrage plan caval ligne maginot
- Map of Plan Caval 06540 Breil sur Roya France
- Ouvrage plan caval top 5 facts
- Description
- References
Map of Plan Caval, 06540 Breil-sur-Roya, France
The ouvrage consists of three blocks facing Italy at an altitude of 1,870 metres (6,140 ft). The ouvrage was manned by 287 soldiers in 1940, under the command of Captain Philipp. Plan-Caval was located to control the Maglia and Cayros valleys, as well as providing flanking cover the La Béole and Saint-Véran. An extensive set of underground barracks and magazines near the uncompleted entrances was never started, so that the ouvrage as constructed consists mostly of a single narrow gallery connecting the combat blocks.
Ouvrage plan caval top 5 facts
Description
Plan Caval is also associated with a nearby casemate with one machine gun embrasure and one advance post bunker. The advanced post is a small blockhouse with three machine gun embrasures.
Other, older fortifications exist in the same neighborhood. The Batterie du Plan Caval and its associated barracks are immediately to the west of the ouvrage.