Suvarna Garge (Editor)

Olympic Park railway line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Services
  
T7 Olympic Park Line

Track length
  
7,000 m

Termini
  
Lidcombe railway station

Operator
  
Sydney Trains

Electrification
  
Overhead 1500V DC

Owner
  
RailCorp

Locale
  
Sydney

Stations
  
1

Olympic Park railway line httpsuploadwikimediaorgwikipediacommonsthu

Opened
  
13 July 1911 (1911-07-13) (Abattoirs) 8 March 1998 (1998-03-08) (Olympic Park)

Track gauge
  
1,435 mm (4 ft 8 ⁄2 in) standard gauge

The Olympic Park railway line serves the Sydney Olympic Park precinct. Originally opened as the Abattoirs branch in 1911, it was rebuilt as the Olympic Park line in 1998.

Contents

Abattoirs line

The line opened on 31 July 1911 as the Abattoirs branch off the Main Western line to the abattoirs and State Brickworks at Homebush. It branched off via a triangular junction behind Flemington Maintenance Depot making it accessible from the Metropolitan Goods line.

Two bridges carried the line over the Great Western Highway. On 11 January 1915, the Metropolitan Meat Platforms opened. Further platforms opened at Abattoirs in December 1926, Brickworks in December 1939 and Pippita in October 1940 to serve a Commonwealth Aircraft Corporation factory. Sidings on the line served Dairy Farmers and Ford.

On 27 February 1968, the three kilometre Homebush Saleyards Yard opened to service new cattle and sheep pens built to replace facilities at Flemington just beyond the Great Western Highway crossing. The loop was electrified to allow 46 class locomotives to operate services from the Main Western and Main Northern lines to the saleyards.

On 9 November 1984, the line beyond the Homebush Saleyards closed. The Saleyards Loop subsequently closed on 22 June 1991.

Passenger services were operated by CPH railmotors operating from Sandown via Lidcombe until November 1984. Pippita continued to be served by a sole daily service to Central until 20 October 1995, operated in its later days by a V set.

Olympic line

As part of Sydney's successful bid to hold the 2000 Olympic Games, a new Sydney Olympic Park precinct was built. Included was a railway that traversed a similar route to the former Abattoirs branch. The line was built with a balloon loop and the two track, four platform Olympic Park station. The line utilised the existing eastern bridge over the Great Western Highway which had previously only carried one track, but was wide enough to accommodate the two laid. The new line opened on 8 March 1998.

Today, the line continues to transport people to and from major events occurring within the Sydney Olympic Park precinct, but also carries workers and residents of Olympic Park to and from the rest of the Sydney Trains network.

Outside of special events, trains to Olympic Park depart from a special platform at Lidcombe (technically platform 0, but referred to as the Olympic Park Sprint Platform rather than its number). Services operate with a frequency of one train every 10 minutes in each direction. The trip between Lidcombe and Olympic Park takes about five minutes each way.

During major events at Sydney Olympic Park, train services run direct from the intercity platforms of Central, also sometimes stopping at Redfern and Strathfield. After larger events, west-bound trains from Olympic Park are sometimes extended beyond Lidcombe to Blacktown via the Western line, and to Glenfield and Campbelltown via the Main South line, using platforms 2 and 4 instead.

References

Olympic Park railway line Wikipedia