Nyagak III Hydroelectric Power Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Uganda

Status
  
Proposed

Normal elevation
  
1,380 m (4,530 ft)

Impound
  
Nyagak River

Location
  
Paidha

Impounds
  
Nyagak River

Tidal range
  
Directions

Turbine
  
2

Nyagak III Hydroelectric Power Station

Similar
  
Nyagak Hydroelectric Power St, Isimba Hydroelectric Power St, Ayago Hydroelectric Power St, Nalubaale Hydroelectric Power St, Bujagali Hydroelectric Power St

Nyagak III Power Station is a 5.5 megawatts (7,400 hp) proposed mini hydroelectric power project in Uganda, the third-largest economy in the East African Community.

Contents

Location

The power station will be located across the Nyagak River in Nyapea Sub County, Okoro County, Zombo District, in the West Nile sub-region of the Northern Region of Uganda. This is approximately 7 kilometres (4 mi) north of the town of Paidha, close to the border with the Democratic Republic of the Congo, in close proximity to, but downstream of, the existing Nyagak I Power Station.

Overview

In September 2010, an Environmental Impact Assessment (EIA) was concluded by Lahmeyer International GmbH, a German consulting engineering firm. The Uganda Electricity Generation Company Limited (UEGCL) would develop Nyagak III through a Public Private Partnership (PPP). In 2013, the International Finance Corporation assisted UEGCL to identify and select an investor from the private sector, who would invest equity and arrange further debt and equity financing for the project. That investor would then design, develop, and operate the development under a PPP agreement with UEGCL. This selection process was expected to last approximately one year, beginning in July 2013. The selected private investor is a consortium consisting of Hydromax Limited and Dott Services Limited. UEGCL and the consortium then formed a special purpose vehicle, Genmax Nyagak Limited, that would build, operate, and manage the power station.

Construction timetable

It was anticipated that the selection process for the core investor would last until 2014. Construction would then begin in 2015 and last three years, with commissioning anticipated in 2018.

Construction costs

In 2011, the construction of Nyagak III Power Station was anticipated to cost approximately US$14 million. The power generated would be evacuated via the existing 33 kilovolt transmission power lines linking the towns of Paidha, Nebbi, Bondo, Okollo, and Arua, constructed at an estimated cost of UGX:44.2 billion (€13 million) between 2013 and 2015 following the development of the Nyagak Power Station.