Girish Mahajan (Editor)

New Varna Stadium

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Full name
  
Arena Varna

Field size
  
105 × 68

Broke ground
  
September 12, 2008

Capacity
  
22,000

Opened
  
2019 (planned)

Location
  
Varna, Bulgaria

Surface
  
Grass

Address
  
9010 Varna, Bulgaria

Year built
  
2018 (planned)

Construction cost
  
35 million EUR

Operator
  
Sports Complex Varna AD

Owners
  
Chimimport (65%), Varna Municipality (35%)

Similar
  
Yuri Gagarin Stadium, Ticha Stadium, Dormition of the Mother of, Varna Archaeological Museum, Spartak Stadium

Arena Varna (Bulgarian: Арена Варна) is a new multi-purpose all-seater stadium currently under construction in Varna, Bulgaria, which is going to be built directly, just rotated to lie on the north-south axis, in the place of the former Yuri Gagarin Stadium. Once finished, the stadium will be used mostly for football matches and will also be the new home ground of the local Cherno More Varna. The venue will have a capacity of 22,000 spectators.

Contents

Project

It was due to open in 2013 and would have a capacity of 30,000 spectators with a possible expansion to 40,000. The stadium, as part of Sport Complex Varna, will have an underground parking area, convertible roof covers, office lounges, two-tier stands and four 50-metre (160 ft) towers, which will block the pressure of the terrain and bring the stadium in a shape of a ship. The convertible roof covers would be made of transparent panels, which would allow the light of the floodlights to stream inside the pitch during night matches. The venue would be awarded with an elite stadium rating by UEFA.

The sport complex and its concept were designed by the German architectural company GMP International GmbH, which built several stadiums for the 2006 FIFA World Cup, including the renovation of the Olympiastadion in Berlin and the construction of the Commerzbank-Arena in Frankfurt respectively. The stadium was also proposed to support a possible bid as a venue for the Euro 2020, which Bulgaria and Romania were planning to host. The construction officially started on September 12, 2008, with the demolishing of the former Yuri Gagarin Stadium.

In the follow-up years, the initial project by GMP International GmbH was partially redesigned due to the financial crisis in 2009 that affected the stadium's construction. As a result, the capacity of the stadium was reduced to 22,000 spectators, the transparent roof covers were replaced and the roof towers were removed from the original design.

Construction

The construction of the new stadium was on hold since 2009, as it was seriously affected from the global financial crisis of 2007-08 and the subsequent lack of funding. In the summer of 2015 however, after public pressure and debates for the need of a new stadium in Varna, the local governors, also represented in the ownership of the stadium as minority shareholders, received 30% of the funding from the sale of a nearby lot. The stadium's construction finally commenced, with Bulgarian construction company Planex being the main contractor. It is expected to be finished in the fall of 2018, with the first match being played in early 2019.