Girish Mahajan (Editor)

Mozambique Ports and Railways

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Mozambique Ports and Railways httpsuploadwikimediaorgwikipediacommonsthu

Portos e Caminhos de Ferro de Moçambique (abbreviated CFM; in English Mozambique Ports and Railways) is the parastatal authority that oversees the railway system of Mozambique and its connected ports.

Contents

The rail system is composed of a total of 2,983 km rail of the 1,067 mm (3 ft 6 in) gauge that is compatible with neighboring rail systems. In addition there is a 140 km line of 762 mm (2 ft 6 in) gauge, the Gaza Railway.

The system developed over more than a century from three different ports at the Indian Ocean that serve as terminals for separate lines to the hinterland. The railroads were major targets during the Mozambican Civil War, were sabotaged by RENAMO, and are being rehabilitated. Management has been largely outsourced. At this time there is no directly interconnecting rail service between the three lines. Each line has its own development corridor.

In August 2010, Mozambique and Botswana signed a memorandum of understanding to develop a 1,100 km railway through Zimbabwe, to carry coal from Serule in Botswana to a deepwater port at Techobanine Point in Mozambique.

Nacala railroad / CFM Norte

Nacala is the terminal of the Nacala Railway, the most recent addition to the railway system. It connects the Nacala Development Corridor and links to the Central East African Railway (CEAR) of Malawi. The railway system is operated by Corredor de Desenvolvimento do Norte. Vale recently bought a stake in the operator; a link is planned from Moatize (where Vale has coal mines) to Malawi, hence connecting to the existing line to Nacala.

Beira railroad / CFM Centro

Beira is the terminal of the Beira railroad, the oldest railway system of Mozambique. Its Machipanda line goes to Harare (formerly Salisbury) and was opened in 1899 as link to then Rhodesia, now Zimbabwe, and its transits. The Sena line of the Beira railroad connects to the coal fields of Moatize with the potential to link to the railway of Malawi as well as to Zambia. As the Beira Railroad Corporation (CCFB) the Beira railway is leased from CFM to the Indian RITES Ltd. and IRCON International consortium.

Maputo railroad / CFM Sul

Maputo, formerly Lourenço Marques, and Matola are the terminals of the Maputo line that links to northeastern part of South Africa. Like the Ressano Garcia Railway Company, the Maputo line is managed by the NLBP (New Limpopo Bridge Project Investments) together with Transnet Freight Rail and CPM with the aim to rehabilitate and operate the line to the border of South Africa. In South Africa the link goes to Komatipoort and further to Johannesburg. The Maputo line also links to Swazi Rail and the National Railways of Zimbabwe.

  • Malawi on Nacala line in operation; link to Sena Line, out of service
  • South Africa yes - same gauge - 1,067 mm (3 ft 6 in)
  • Swaziland yes - same gauge - 1,067 mm (3 ft 6 in)
  • Tanzania no direct link - break of gauge - 1,067 mm (3 ft 6 in)/1,000 mm (3 ft 3 38 in)
  • Zambia no direct link, Nacala line passes first through Malawi.
  • Zimbabwe yes - same gauge - 1,067 mm (3 ft 6 in), from Beira and from Maputo (Limpopo Line)
  • References

    Mozambique Ports and Railways Wikipedia


    Similar Topics