Trisha Shetty (Editor)

Mississippi Highway 304

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Length
  
23.18 km

West end:
  
US 61 near Lake Cormorant

East end:
  
I-269 at the Tennessee state Line

Mississippi Highway 304 (MS 304) consists of two routes in northwest Mississippi:

Contents

Map of MS-304, Hernando, MS 38632, USA

  • A freeway-grade route coinciding with most of SIU 10 of Interstate 69, beginning at U.S. Route 61 just north of the Tunica/DeSoto County line, then running east to I-55 in northern Hernando, entirely in DeSoto County.
  • A scenic route, which begins at I-55 and MS 306 in Coldwater, runs west to MS 301 in Arkabutla, then north along MS 301 to the former routing of MS 304, then east to Hernando to end at I-55 (exit 280).
  • MS 304 formerly ran on a two-lane alignment south of the present routing from U.S. 61 in Tunica Resorts (Tunica County) east to Interstate 55 in Hernando. The western portion of the former route is now officially part of MS 713; the remainder of the route (except the portion that is part of the scenic route noted above) no longer has an official state designation, but a number of state highway markers still appear along the route and at intersections.

    Route description

    MS 304 begins at a trumpet interchange with US 61 east of Tunica Resorts in the floodplain of the Mississippi River. The four-lane freeway has a half-diamond interchange with MS 3 that allows access to and from the east. MS 304 crosses over a rail line and has a partial interchange with a stub of I-69 that leads to MS 713 at Banks; the interchange includes a flyover from the westbound direction of the freeway. Immediately to the east of the interchange, MS 304 and I-69 leave the Mississippi River floodplain. The freeway has diamond interchanges with MS 301, Fogg Road, and Tulane Road. MS 304 and I-69 cross another rail line and pass over US 51 with no access just west of the state highway's terminus at I-55 on the northern end of Hernando, where I-69 joins I-55 heading north toward Memphis. The highways meet at a full cloverleaf interchange with the easternmost ramps closed until MS 304 is extended eastward.

    Future

    East of Hernando, the proposed route of MS 304 coincides with proposed Interstate 269, continuing east to enter Marshall County near Byhalia to intersect U.S. Highway 78 (Old future Interstate 22), then turning north to cross the Mississippi–Tennessee border near Piperton. Tennessee would construct the remainder of the route north to existing TN 385. This portion of the route is currently in the planning stages, with construction expected to begin around 2009. This section opened from I-269s Proposed Northern end to an interchange just south of the MS-TN border in October,

    Exit list

    The entire route is in De Soto County. All exits are unnumbered.

    References

    Mississippi Highway 304 Wikipedia