Girish Mahajan (Editor)

Mir EO 6

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Mission type
  
Mir expedition

Space Station
  
Mir

Orbits completed
  
2,833

Mission duration
  
179 days, 1 hours, 17 minutes (launch to landing)

Began
  
11 February 1990 (1990-02-11)

Ended
  
9 August 1990, 04:08:49 (1990-08-09UTC04:08:50Z) UTC

Mir EO-6 was the sixth long duration expedition to the space station Mir. The two crew members were Anatoli Soloviyov (Commander) and Aleksandr Balandin (Flight Engineer).

Contents

Crew

The backup crew for this expedition were Gennadi Manakov (Commander) and Gennadi Strekalov (Flight Engineer).

Crew Arrival

The two crew members arrived at Mir via Soyuz TM-9, which launched on 11 February 1990. The Soyuz spacecraft docked on to the Kvant2 Complex.

Mission Highlights

While on board, the crew conducted an extensive programme of geophysical and astrophysical research, experiments on biology and biotechnology and work on space materials science. They started the commercial production of crystal in highest quality for an US electronic company. A protein grow experiment was also profitable (25 Million Rubel. A first EVA was conducted on 17 July 1990, lasting 7h 16m, in which Soyuz TM-9 was repaired after 3 of 8 thermal blankets had come loose near the heat shield. Another EVA was performed on 26 July 1990 (3h 31m), in order to repair the Kvant2 Module hatch, but this failed.

Expedition Conclusion

The crew left on Soyuz TM-9 on 9 August 1990. The expedition in total lasted 179 days, 1 hour and 17 minutes. The crew completed 2833 orbits of the Earth.

References

Mir EO-6 Wikipedia