Girish Mahajan (Editor)

Milan Metro Line 4

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Rapid Transit

Status
  
under construction

Line length
  
15 km (when complete)

Stations
  
21

System
  
Milan Metro

Opened
  
2022

Locale
  
Milan

Milan Metro Line 4 httpswwwsaliniimpregilocomstaticuploadfot

Track gauge
  
1,435 mm (4 ft 8 ⁄2 in)

Operator
  
Azienda Trasporti Milanesi

The Line 4 is a new underground rapid transit line under construction in Milan, Italy, part of the Milan Metro system. The line was planned to be completed in 2015, as part of the works for the upcoming Milan Expo. However, delays in planning, financing and construction works forced to postpone the opening, and the line is now expected to open in 2022.

The line will be 15 km (9.3 mi) long with 21 stations. The expected annual ridership is 87 million. The total estimated cost is about €1.7 billion. 786 million will be granted by the government, 512 million will come by private investors and 400 from the city of Milan. The line will feature completely automatic driverless trains and is designed for a capacity of 24-28,000 passengers per hour in each direction.

The consortium ATM - Impregilo will be responsible for the construction works.

Route

The line is planned to connect the south-western neighborhood of Lorenteggio with the Linate Airport on the east, passing through the city center.

References

Milan Metro Line 4 Wikipedia