Country
  
Greece

Opening date
  
2001

Height
  
150 m

Owner
  
Public Power Corporation

Impound
  
Achelous River

Location
  
Mesochora, Trikala

Type of dam
  
Embankment, earth-fill

Surface area
  
7.8 km²

Construction began
  
1996

Mesochora Dam httpsuploadwikimediaorgwikipediacommons22

Purpose
  
River diversion, irrigation, power

Status
  
Complete, not commissioned

Similar
  
Stratos Dam, Kastraki Dam, Kremasta Dam, Thissavros Dam, Antamina Tailings Dam

The Mesochora Dam is concrete-face rock-fill dam on the Acheloos River near Mesochora in Trikala, Greece. The 150 m (490 ft) tall dam is part of the Acheloos River Diversion which is intended to divert a portion of the Acheloos west to irrigate 240,000–380,000 ha (590,000–940,000 acres) in the Thessaly plains. The project includes the Mesochora, Sykia, Mouzaki and Pyli Dams along with a 17.4 km (10.8 mi) long channel.

The idea for an Acheloos to Thessaly diversion project was first envisioned in the 1930s but a lack of funding precluded construction. Interest in the project was revived in 1984 and what was supposed to be a small dam at Mesochora apart from the diversion project was increased in size to support to river diversion. Over the next several years there was a series of legal battles that led to construction stalling, most recently in 2005. Opponents of the scheme cite significant changes to the environment, flooding of villages and that the scheme will divert 600,000,000 m3 (490,000 acre·ft) of water annually from the Acheloos. Supporters call on the benefit to the lucrative cotton crops it will help irrigate and the dam's planned 162 MW hydroelectric power plant. The Mesochora Dam was completed in January 2001 but the reservoir has yet to be filled and the power plant has subsequently not been commissioned due to legal battles.