Country
  
Chile

Status
  
Project approved

Type
  
CSP

Units operational
  
4

Location
  
Antofagasta

Commission date
  
Dec 2012

CSP technology
  
Solar power tower

María Elena Solar Power Plant

María Elena Solar Power Plant (Spanish: Planta Termosolar María Elena) is a concentrated solar power plant with a molten salt heat storage#Molten salt technology system that is currently under construction in the commune of María Elena in the Antofagasta Region of Chile.

Contents

María Elena

The María Elena plant will see the construction and operation of a 400 MW thermo-solar complex in the northern Chilean region of Antofagasta. Thermo solar technology, which employs a heliostat receiver system, has proven to be up to five times more cost effective than standard photovoltaic solar panels.

Details

The María Elena complex will be made up of four separate 100 MW plants, and will supply the northern SING (Sistema Interconectado del Norte Gande) grid via a 17.5 km, 220 kV double circuit transmission line connected to the Encuentro substation. The $3.6 billion thermo solar plant will be the largest plant of its kind in the world. The project is being developed by Ibereólica Solar Atacama, a subsidiary of Madrid-based Grupo Ibereólica. It will employ 1,500 workers during the construction stage and 200 as permanent staff when in operation. Construction will take 27 months so the plant will be operational in July 2016 at the earliest.