Neha Patil (Editor)

Manitowoc Shipbuilding Company

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Founded
  
1902

Manitowoc Shipbuilding Company

Manitowoc Shipbuilding Company, located in Manitowoc, Wisconsin, was a major shipbuilder for the Great Lakes. It was founded in 1902, and made mainly steel ferries and ore haulers. During World War II, it built submarines, tank landing craft (LCTs), and self-propelled fuel barges called "YOs". Employment peaked during the military years at 7000. The shipyard closed in 1968, when Manitowoc Company bought Bay Shipbuilding Company and moved their shipbuilding operation to Sturgeon Bay.

Contents

Submarine Building Program

Shipyard President Charles C. West contacted the Bureau of Construction and Repair in 1939 to propose building destroyers at Manitowoc and transporting them through the Chicago River, Chicago Sanitary and Ship Canal, Illinois River, and Mississippi River in a floating drydock towed by the tugboat Minnesota. After evaluating the plan and surveying the shipyard, the Navy suggested building submarines instead. A contract for ten submarines was awarded on 9 September 1940. The Navy paid for lift machinery on Chicago's Western Avenue railroad bridge to clear a submarine. The 15-foot-draft submarines entered the floating drydock on the Illinois River to get through the 9-foot-deep Chain of Rocks Channel near the confluence of the Mississippi and Missouri Rivers. Submarines left the drydock at New Orleans and reinstalled periscope shears, periscopes, and radar masts which had been removed to clear bridges over the river.

Manitowoc had never built a submarine before, but the first was completed 228 days before the contract delivery date. Contracts were awarded for additional submarines, and the last submarine was completed by the date scheduled for the 10th submarine of the original contract. Total production of 28 submarines was completed for $5,190,681 less than the contract price.

List of Fleet Submarines Built by Manitowoc

  • 1942 USS Peto sank 7 ships in 10 World War II Pacific patrols
  • 1942 USS Pogy sank 16 ships in 10 World War II Pacific patrols
  • 1942 USS Pompon sank 3 ships in 9 World War II Pacific patrols
  • 1942 USS Puffer sank 8 ships in 9 World War II Pacific patrols
  • 1942 USS Rasher sank 18 ships in 8 World War II Pacific patrols, 2nd highest tonnage sunk by a US submarine during the war
  • 1943 USS Raton sank 9 ships in 8 World War II Pacific patrols
  • 1943 USS Ray sank 14 ships in 8 World War II Pacific patrols
  • 1943 USS Redfin sank 5 ships in 7 World War II Pacific patrols
  • 1943 USS Robalo 3 World War II Pacific patrols
  • 1943 USS Rock sank 1 ship in 6 World War II Pacific patrols
  • 1943 USS Golet 2 World War II Pacific patrols
  • 1943 USS Guavina sank 5 ships in 6 World War II Pacific patrols
  • 1943 USS Guitarro sank 6 ships in 5 World War II Pacific patrols
  • 1943 USS Hammerhead sank 11 ships in 7 World War II Pacific patrols
  • 1943 USS Hardhead sank 7 ships in 6 World War II Pacific patrols
  • 1944 USS Hawkbill sank 6 ships in 5 World War II Pacific patrols
  • 1944 USS Icefish sank 2 ships in 5 World War II Pacific patrols
  • 1944 USS Jallao sank 2 ships in 4 World War II Pacific patrols
  • 1944 USS Kete sank 3 ships in 2 World War II Pacific patrols
  • 1944 USS Kraken 4 World War II Pacific patrols
  • 1944 USS Lagarto sank 3 ships in 2 World War II Pacific patrols
  • 1944 USS Lamprey 3 World War II Pacific patrols
  • 1944 USS Lizardfish 2 World War II Pacific patrols
  • 1944 USS Loggerhead 2 World War II Pacific patrols
  • 1944 USS Macabi 1 World War II Pacific patrol
  • 1944 USS Mapiro
  • 1944 USS Menhaden
  • 1945 USS Mero
  • References

    Manitowoc Shipbuilding Company Wikipedia