Neha Patil (Editor)

Mailiao Power Plant

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Official name
  
麥寮電廠

Status
  
Operational

Country
  
Republic of China

Construction began
  
12 December 1996

Mailiao Power Plant

Location
  
Mailiao, Yunlin, Taiwan

Commission date
  
1999 (Unit 1 & 2) 2000 (Unit 3 & A) 2001 (Unit 5 & B) 2002 (Unit 4)

Construction cost
  
NT$40 billion (US$1.16 billion)

Owners
  
Mai-Liao Power Corporation, Formosa Petrochemical Corp.

The Mailiao Power Plant (Chinese: 麥寮電廠; pinyin: Màiliáo Diànchǎng) is a coal-fired power plant in Mailiao, Yunlin, Taiwan. With a total installed capacity of 4,200 MW, the plant is Taiwan's third largest coal-fired power plant after Taichung Power Plant and Hsinta Power Plant.

Contents

History

The groundbreaking ceremony for the power plant construction was held on 12 December 1996. Invited to the ceremony were Vice Premier Hsu Li-teh, Minister of Economic Affairs Wang Chih-kang and President of Legislative Yuan Liu Sung-pan.

Commissioned in June 1999 for its first two units, the power plant is the first independent power producer power plant after Taipower ended the electricity supply monopoly in Taiwan in 1994.

Ownership

The power plant is owned by the Mai-Liao Power Corporation (MPC) and Formosa Petrochemical Corporation (FPCC).

Generation units

The power plant consists of five 600 MW pulverized coal-fired units owned by the MPC and two 600 MW pulverized coal-fired co-generation units owned by the FPCC. The plant is designed for base load service with the capability for daily startup and shutdown operation per instructions from Taipower's dispatcher center.

Components

The coal handling system of the power plant has a truck unloading station capacity of 600 tonnes/hour and its flexible sidewall conveyor capacity of 800 tonnes/hour. The coal is stored in coal domes in which each dome is 120 meter in diameter, 60 meter in height and 180,000 tons in capacity.

June 2012

On 20 June 2012 at 11:55 am, the power plant tripped during the Tropical Storm Talim. This caused the shut down of 54 out of 66 units of the Yunlin petrochemical complex.

August 2016

On 1 August 2016, a generating unit of the power plant broke down, disrupting the supply of power.

References

Mailiao Power Plant Wikipedia