Country
  
Nepal

Purpose
  
Power

Opening date
  
2015

Location
  
Ilam district

Status
  
In operation

Construction began
  
2010

Official name
  
Sanima Mai Hydropower Project

Mai Cascade Hydropower Station is a run-of-the-river hydroelectric power station with an installed capacity of 7 MW. This power station is located at Danabari VDC in Ilam district of Nepal. The plant utilizes tail water of Mai Hydropower Station. The construction of power station started on 2013 and completed in 2015.

The power is evacuated through 33 kV transmission line of about 4.0 km length up to switchyard area of Mai hydropower project. The transmission line is further connected to the national grid of Nepal through the 132KV transmission line.