Purpose Power Opening date 2014 Construction began 2010 | Location Ilam district Status Testing Height 12 m | |
![]() | ||
Official name Sanima Mai Hydropower Project |
Sanima Mai Hydropower Station is a run-of-the-river hydroelectric power station with an installed capacity of 22 MW. This power station is located at Gunmune and Chisapani VDC in Ilam district of Nepal. Construction began in 2010 and all major works were completed by October 2014. However, the power station was not operational at the time due to an unfinished transmission line.
The plant is operated by Sanima Mai Hydropower Limited, a public company developing various hydropower projects in Nepal.