Mahinerangi Wind Farm

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
New Zealand

Owner(s)
  
Tilt Renewables

Site area
  
17.23 km²

Construction began
  
September 2010

Units operational
  
12

Status
  
Operational

Type
  
Onshore

Make and model
  
Vestas

Construction cost
  
75 million NZD

Mahinerangi Wind Farm wwwwindenergyorgnzstoreimagesMahinerangiJPG

Location
  
north of Lake Mahinerangi, Otago

Commission date
  
March 2011 (March 2011)

Mahinerangi wind farm 360


The Mahinerangi Wind Farm is a wind farm on the north side of Lake Mahinerangi, around 50 km west of Dunedin, in Otago, New Zealand. Stage one of the wind farm, generating 36 MW, was commissioned in March 2011, and an additional 164 MW is consented to be commissioned in further stages.

Contents

The wind farm is owned and operated by Tilt Renewables. It was the second major wind farm to be built in the South Island.

Mahinerangi wind farm


History

Resource consent was granted in 2007 and later confirmed after an appeal to the Environment Court.

Construction of stage 1 of the wind farm, consisting of twelve turbines, began in September 2010. Vestas V90-3MW turbines were chosen for the wind farm, having previously been used for stage 3 of Tararua Wind Farm in 2007. Turbines were shipped to Port Chalmers, and trucked through Dunedin to their final site.

The wind farm generated its first electricity on 21 February 2011, with the first two turbines being commissioned. All twelve stage one turbines were completed and generating electricity by the end of March 2011.

Location

The wind farm will be contained within 17.23 km2 (6.65 sq mi) of land at an elevation of 600 to 730 meters above sea level and about 50 kilometres west of Dunedin. Most of the land in the proposed site is pasture grazed by sheep and cattle.

Transmission

Electricity generated from Stage 1 turbines will be injected into TrustPower's nearby Deep Stream and Waipori hydro schemes. This allows the wind turbines to operate in synergy with the hydro schemes, allowing water to be preserved during off-peak times while the wind farm is generating. Electricity from Stage 1 and the hydro schemes is then injected into either Dunedin's local distribution network, or into Transpower's Halfway Bush-Balclutha-Gore 110 kV line at Berwick.

Stage 2 and beyond is too large to inject into the Waipori/Deep Stream system. Instead, it will inject into Transpower's Halfway Bush-Roxburgh 110 kV line, which passes a short distance south of the wind farm.