London to Aylesbury Line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Status
  
Operational

Stations
  
16

London to Aylesbury Line httpsuploadwikimediaorgwikipediacommonsthu

Type
  
Commuter rail, Suburban rail, Rapid transit

System
  
London Underground National Rail

Locale
  
Greater London South East England

Termini
  
London Marylebone Aylesbury Vale Parkway (Passenger) Calvert (Freight)

Depot
  
Aylesbury railway station (Chiltern)

Owners
  
London Underground, Network Rail

Rolling stocks
  
British Rail Class 165, British Rail Class 168

The London to Aylesbury Line is a railway line between London (Marylebone) and Aylesbury, going via the Chiltern Hills; it is operated by Chiltern Railways. Nearly half of the line is owned London Underground, approximately 16 miles (26 km) – the total length of the passenger line is about 39 miles (63 km) with a freight continuation.

Contents

The line is part of the former trunk route, the Great Central Main Line.

History

The route towards Aylesbury opened in stages between 1868 and 1899:

  1. The Metropolitan & St. John’s Wood Railway (later part of the Metropolitan Railway) opened from Baker Street to Swiss Cottage in 1868.
  2. The Aylesbury and Buckingham Railway connected Verney Junction with Aylesbury in 1868. The route would become part of the Met in 1891.
  3. In 1879 the Met was extended from Swiss Cottage to Willesden Green.
  4. In 1880 to Harrow-on-the-Hill.
  5. In 1885 to Pinner.
  6. In 1887 to Rickmansworth.
  7. In 1889 to Chesham.
  8. Then in September 1892 the Metropolitan connected to Aylesbury via Amersham, making the Chesham route a branch line.

The Great Central Railway (GCR) decided to build a main line called the London Extension from Annesley Junction north of Nottingham to London via the Metropolitan Railway. It was the last main line to be built in Britain until High Speed 1. The line was completed in 1899. In 1903 the line between Harrow and Canfield Place (near Finchley Road) was built, thus bypassing this part of the Metropolitan tracks. The route was a major trunk route with many prestigious trains, such as The Master Cutler and The South Yorkshireman.

The line beyond Aylesbury Vale Parkway is currently closed to almost all passenger services: the Metropolitan line service north of Aylesbury to Verney Junction and Brill was withdrawn in 1936 as London Transport (LT) wanted to focus more closely on London. The permanent way is now lost.

The line north west from Harrow was electrified in stages. In 1925, four rail electrification reached Rickmansworth and Watford, and the Metropolitan Railway planned to electrify the line as far as Aylesbury by 1935. However, when the Met was absorbed into LT the plans were put on hold. Electrification of the final leg of the Met finally got under way in the late 1950s, but LT decided later to electrify only up to Amersham. The original intention to electrify further is evidenced by the colour light signalling which was fully installed as far as Aylesbury and by platform extensions up to Stoke Mandeville. In 1961 LT withdrew the Metropolitan line from Aylesbury and since then it goes only as far as Amersham. Following the end of steam-hauled Metropolitan line trains in 1961 the service was provided by British Rail Class 115 diesel multiple units until 1992 (which were then replaced by the line's current rolling stock) - along with Metropolitan line electric multiple units south of Amersham. Responsibility for the line north of Amersham was transferred from London Transport to British Railways on 11 September 1961; London Underground signage at the stations on this section was gradually replaced by those of British Railways.

The mainline services north of Aylesbury (via Woodford Halse, Rugby and Loughborough to Nottingham Victoria and beyond) were withdrawn in 1966 as the Great Central Main Line was seen by Dr Beeching as a duplicate of the Midland Main Line. Now only freight services to Calvert and specials to and from Quainton run (the specials only run on certain Bank Holidays). The track remains in situ from Calvert west to Bicester Town and intermittently east to Bletchley.

Intercity 125 trains were used on the line, albeit rarely, during the 1980s. Also in the 1980s, there were passenger specials north to Milton Keynes from Marylebone via Aylesbury and High Wycombe, which picked up passengers at Quainton Road and the disused Winslow railway station.

On 14 December 2008, Chiltern Railways opened a new station, Aylesbury Vale Parkway. This station is situated two miles NW of Aylesbury station.

Route description

From Marylebone the line runs through a series of tunnels as far as Finchley Road, from where the line runs overground and runs parallel to the Metropolitan and Jubilee lines. A passenger on a train departing from Marylebone can see the Metropolitan line just before the train enters the first tunnel, because the tunnels used by these two lines run a few yards apart. At Neasden Junction, the Chiltern Main Line diverges to the west, while the Aylesbury line continues north parallel to the underground lines, passing Wembley Stadium.

The line then joins the Metropolitan line tracks a few yards south of Harrow-on-the-Hill station and shares this track with the London Underground's fast Metropolitan line services to Amersham from London Baker Street. This section runs parallel to the slow Met Line to Northwood and Watford. The line goes under the M25 north of Rickmansworth. After Chalfont & Latimer station, the Chesham branch diverges, and the main line continues to Amersham, the terminus for Metropolitan line trains.

Beyond Amersham the line returns to Network Rail control and runs north west to Aylesbury, roughly following the A413 road. The Princes Risborough line joins the main line at Aylesbury, where Chiltern Railways have a maintenance depot. There, the line becomes single track, and after Aylesbury Vale Parkway, freight only, passing through Quainton Road to Calvert, the site of a major waste transfer station and landfill site. Beyond Calvert, at the former junction, the line turns east to join the Varsity Line, while the trackbed of the former Great Central Main Line continues north west.

Due to topography and building in stages rather than to reach a distant city the line has relatively harsh curves and steep gradients compared to longer distance lines hence the GCR built a newer line (the Chiltern Main Line) to Woodford Halse in 1906.

London Underground-owned section

London Underground own the track and co-run on the line between Harrow on the Hill and the property boundary 1.4 miles (2.3 km) north of Amersham, near Weedonhill Wood (sometimes erroneously referred to as Mantles Wood).

Towns/villages served

The line serves the following stations:

  • London Marylebone
  • Harrow on the Hill
  • Rickmansworth
  • Chorleywood
  • Chalfont and Latimer
  • Amersham
  • Great Missenden
  • Wendover
  • Stoke Mandeville
  • Aylesbury
  • (Quainton)
  • Operation

    Passenger services are provided by Chiltern Railways. From Marylebone to Neasden Junction the track is shared with the Chiltern Main Line and from Harrow to Amersham the track is shared with London Underground's Metropolitan line, and is used by their "fast" services. As a result, all Chiltern trains must be fitted with the tripcock braking system to run on Underground lines. Marylebone Signalling Control Centre controls all the signals on the line between Marylebone and south of Harrow, and also from north of Amersham to Aylesbury. Marylebone can see all train movements throughout the line but does not control the signals on the Metropolitan line section. These are operated by London Underground signal cabins at Harrow, Rickmansworth and Amersham. The Network Rail-controlled section of the line is fully equipped with ATP, one of three lines in Britain to have this (the others being the Chiltern Main Line and the Great Western Main Line). As a result, all Chiltern trains must be equipped with ATP equipment.

    The line operates lower frequency timetables during autumn as trains need to take more time to brake due to the leaves that fall on the line in the heavily wooded section between Amersham and Rickmansworth.

    Weekday off-peak service pattern

    As of 28 December 2014:

    † - tph = train(s) per hour

    Future

  • Following completion of a major track work project in December 2006, journey times on the line were cut by about 10 minutes. Currently major track replacement work is under way on the London Underground parts of the line, to increase maximum speeds.
  • The line north of Aylesbury was reopened to regular passenger traffic in 2008 as far as the new Aylesbury Vale Parkway station. In the long term, the line is to reopen beyond Aylesbury Vale Parkway to allow passenger services to reach Milton Keynes Central and Bedford via the East West Rail Link.
  • A proposal announced in March 2010 would route the future high speed line, High Speed 2, parallel with a section of the Chiltern Main Line. If this is undertaken, it will be a non-stop service, with no interconnects with the Chiltern Line.
  • National Rail passenger volume

    These are the passenger usage statistics on the National Rail network from the year beginning April 2002 to the year beginning April 2012. Large increases in the final year in some stations are mainly due to the introduction of Oyster Cards on the National Rail Network. The reason there were no usage figures in the first three years for stations from Amersham to Harrow-on-the-Hill was because these figures were not yet separated from the London Underground figures, who own and share the same tracks at this point. Aylesbury Vale Parkway has no previous data for the first five years as it only opened in 2008.

    References

    London to Aylesbury Line Wikipedia