Opening date
  
2014

Creates
  
Liyuan Reservoir

Height
  
155 m

Surface area
  
14.73 km²

Impound
  
Jinsha River

Impounds
  
Jinsha River

Commission date
  
2014-2015

Catchment area
  
220,000 km²

Construction began
  
2008

Liyuan Dam

Location
  
Border of Yulong County and Shangri-La County, Yunnan Province

Total capacity
  
727,000,000 m (589,388 acre·ft)

Construction cost
  
16.2 billion CNY ($2.4 billion USD)

Similar
  
Ludila Dam, Shuangjiangkou Dam, Tasang Dam

The Liyuan Dam is a concrete-face rock-fill dam on the Jinsha River on the border of Yulong County and Shangri-La County, Yunnan Province, China. The dam will have an associated hydroelectric power station with a 2,400 MW power station containing 4 x 600 MW generators. Construction on the river diversion for the dam began in 2008. It began to impound its reservoir in November 2014 and on December 28, 2014 the first generator was commissioned. The second generator was commissioned in July 2015.

The 155 m (509 ft) dam withholds a reservoir of 727,000,000 m3 (589,388 acre·ft), of which 209,000,000 m3 (169,439 acre·ft) is active or "useful" storage. The normal reservoir level is 1,618 m (5,308 ft) above sea level with a minimum of 1,602 m (5,256 ft). The catchment area for the reservoir in the upstream basin is 220,000 km2 (84,942 sq mi) while the reservoir surface area is 14.73 km2 (6 sq mi).