Opening date   2014 Creates   Liyuan Reservoir Height   155 m Surface area   14.73 km²  | Commission date   2014-2015 Catchment area   220,000 km² Construction began   2008  | |
![]()  | ||
Location   Border of Yulong County and Shangri-La County, Yunnan Province Total capacity   727,000,000 m (589,388 acre·ft) Construction cost   16.2 billion CNY ($2.4 billion USD) Similar   Ludila Dam, Shuangjiangkou Dam, Tasang Dam  | ||
The Liyuan Dam is a concrete-face rock-fill dam on the Jinsha River on the border of Yulong County and Shangri-La County, Yunnan Province, China. The dam will have an associated hydroelectric power station with a 2,400 MW power station containing 4 x 600 MW generators. Construction on the river diversion for the dam began in 2008. It began to impound its reservoir in November 2014 and on December 28, 2014 the first generator was commissioned. The second generator was commissioned in July 2015.
The 155 m (509 ft) dam withholds a reservoir of 727,000,000 m3 (589,388 acre·ft), of which 209,000,000 m3 (169,439 acre·ft) is active or "useful" storage. The normal reservoir level is 1,618 m (5,308 ft) above sea level with a minimum of 1,602 m (5,256 ft). The catchment area for the reservoir in the upstream basin is 220,000 km2 (84,942 sq mi) while the reservoir surface area is 14.73 km2 (6 sq mi).