Samiksha Jaiswal (Editor)

List of Caracas Metro stations

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
List of Caracas Metro stations

The Caracas Metro (referred as El Metro by locals) is a rapid transit system operating in Caracas, capital of Venezuela. As of 2015, including Los Teques Metro, the Caracas Metro is made up of 47 stations.

Contents

Below is a list of the Caracas Metro metro lines and the stations that they serve.

Line 1 (Red)

From west to east:

  • Propatria
  • Pérez Bonalde
  • Plaza Sucre
  • Gato Negro
  • Agua Salud – Future point of transfer to Line 6
  • Caño Amarillo
  • Capitolio – Point of transfer to Line 2
  • La Hoyada – Future point of transfer to Line 3
  • Parque Carabobo
  • Bellas Artes
  • Colegio de Ingenieros
  • Plaza Venezuela – Point of transfer to Line 3 and Line 4
  • Sabana Grande
  • Chacaíto
  • Chacao
  • Altamira
  • Miranda (formerly: Parque del Este) – Future point of transfer to Line 4
  • Los Dos Caminos – Future point of transfer to Line 6
  • Los Cortijos
  • La California
  • Petare
  • Palo Verde
  • Line 2 (Green)

    Line 2 was operates on much of the same route that Line 4 does. From north-east to south-west its stations are:

  • El Silencio – Point of transfer to Line 1
  • Capuchinos – Point of transfer to Line 4
  • Maternidad – Point of transfer to Line 4
  • Artigas – Point of transfer to Line 4
  • La Paz – Point of transfer to Line 4
  • La Yaguara – Point of transfer to Line 4
  • Carapita – Point of transfer to Line 4
  • Antímano – Point of transfer to Line 4
  • Mamera – Point of transfer to Line 4
  • Caricuao
  • Zoológico
  • Line 3 (Blue)

    From north-east to south-west:

  • Plaza Venezuela – Point of transfer to Line 1 and Line 4
  • Ciudad Universitaria
  • Los Símbolos
  • La Bandera
  • El Valle
  • Los Jardines
  • Coche
  • Mercado
  • La Rinconada – IFE rail station, both completed and in service
  • Next phase (project). Begins as a west ramification from El Valle station to north on San José station

  • El Valle
  • Prado de María
  • El Peaje
  • San Agustín
  • Fuerzas Armadas – Point of transfer to Line 1 and Line 4
  • Urdaneta
  • San José
  • Line 4 (Yellow)

    Construction works for next phase were initiated 18 March 2007 and expected to be completed by year-end 2011. Line 4 was operates on much of the same route that Line 2 does.

    From north-east to south-west:

  • Zona Rental – Point of transfer with Line 1 and Line 3
  • Parque Central
  • Nuevo Circo
  • Teatros
  • Capuchinos – Point of transfer to Line 2
  • Maternidad – Point of transfer to Line 2
  • Artigas – Point of transfer to Line 2
  • La Paz – Point of transfer to Line 2
  • La Yaguara – Point of transfer to Line 2
  • Carapita – Point of transfer to Line 2
  • Antímano – Point of transfer to Line 2
  • Mamera – Point of transfer to Line 2
  • Ruiz Pineda
  • Las Adjuntas – Transfer station for Los Teques Metro
  • Line 5 (Purple)

    This line is still under construction.

    First phase – from west to east:

  • Bello Monte
  • Las Mercedes
  • Tamanaco – Future point of transfer to Line 5
  • Chuao
  • Bello Campo
  • Miranda/Hugo Chávez (formerly: Parque del Este II) – Point of transfer to Line 1
  • The following stations found in the City of Caracas are under construction, as part of the project known as the Guarenas / Guatire Metro:

  • Miranda/Hugo Chávez (formerly: Parque del Este II) – Point of transfer to Line 1
  • Montecristo
  • Boleíta
  • El Marqués
  • Warairarepano – Point of transfer to the Guarenas / Guatire (light rail) line
  • Line 6 (Orange)

    Most of this line is still in planning. It will connect Line 2 and Line 3.

    Los Teques Metro (Cyan)

  • Las Adjuntas – transfer station to Caracas Metro Line 2
  • Alí Primera (formerly: El Tambor)
  • Guiacaipuro
  • Independencia
  • The following stations are under construction:

  • Los Cerritos – projected completion date set for 2012
  • Carrizal – projected completion date set for 2012
  • Las Minas – projected completion date set for 2012
  • San Antonio – projected completion date set for 2012
  • Guarenas / Guatire (Teal)

    This is a light rail line. The following stations are under construction, as part of the project known as the Guarenas / Guatire Metro:

  • Warairarepano – Point of transfer to line Line 5
  • Caucaugüita – projected completion date set for 2012
  • Belén – planned future station
  • Guarenas I – projected completion date set for 2012
  • Guarenas II – projected completion date set for 2012
  • Guatire I – projected completion date set for 2012
  • Guatire II – projected completion date set for 2012
  • References

    List of Caracas Metro stations Wikipedia


    Similar Topics