The Caracas Metro (referred as El Metro by locals) is a rapid transit system operating in Caracas, capital of Venezuela. As of 2015, including Los Teques Metro, the Caracas Metro is made up of 47 stations.
Below is a list of the Caracas Metro metro lines and the stations that they serve.
From west to east:
Propatria
Pérez Bonalde
Plaza Sucre
Gato Negro
Agua Salud – Future point of transfer to Line 6
Caño Amarillo
Capitolio – Point of transfer to Line 2
La Hoyada – Future point of transfer to Line 3
Parque Carabobo
Bellas Artes
Colegio de Ingenieros
Plaza Venezuela – Point of transfer to Line 3 and Line 4
Sabana Grande
Chacaíto
Chacao
Altamira
Miranda (formerly: Parque del Este) – Future point of transfer to Line 4
Los Dos Caminos – Future point of transfer to Line 6
Los Cortijos
La California
Petare
Palo Verde
Line 2 was operates on much of the same route that Line 4 does. From north-east to south-west its stations are:
El Silencio – Point of transfer to Line 1
Capuchinos – Point of transfer to Line 4
Maternidad – Point of transfer to Line 4
Artigas – Point of transfer to Line 4
La Paz – Point of transfer to Line 4
La Yaguara – Point of transfer to Line 4
Carapita – Point of transfer to Line 4
Antímano – Point of transfer to Line 4
Mamera – Point of transfer to Line 4
Caricuao
Zoológico
From north-east to south-west:
Plaza Venezuela – Point of transfer to Line 1 and Line 4
Ciudad Universitaria
Los Símbolos
La Bandera
El Valle
Los Jardines
Coche
Mercado
La Rinconada – IFE rail station, both completed and in service
Next phase (project). Begins as a west ramification from El Valle station to north on San José station
El Valle
Prado de María
El Peaje
San Agustín
Fuerzas Armadas – Point of transfer to Line 1 and Line 4
Urdaneta
San José
Construction works for next phase were initiated 18 March 2007 and expected to be completed by year-end 2011. Line 4 was operates on much of the same route that Line 2 does.
From north-east to south-west:
Zona Rental – Point of transfer with Line 1 and Line 3
Parque Central
Nuevo Circo
Teatros
Capuchinos – Point of transfer to Line 2
Maternidad – Point of transfer to Line 2
Artigas – Point of transfer to Line 2
La Paz – Point of transfer to Line 2
La Yaguara – Point of transfer to Line 2
Carapita – Point of transfer to Line 2
Antímano – Point of transfer to Line 2
Mamera – Point of transfer to Line 2
Ruiz Pineda
Las Adjuntas – Transfer station for Los Teques Metro
This line is still under construction.
First phase – from west to east:
Bello Monte
Las Mercedes
Tamanaco – Future point of transfer to Line 5
Chuao
Bello Campo
Miranda/Hugo Chávez (formerly: Parque del Este II) – Point of transfer to Line 1
The following stations found in the City of Caracas are under construction, as part of the project known as the Guarenas / Guatire Metro:
Miranda/Hugo Chávez (formerly: Parque del Este II) – Point of transfer to Line 1
Montecristo
Boleíta
El Marqués
Warairarepano – Point of transfer to the Guarenas / Guatire (light rail) line
Most of this line is still in planning. It will connect Line 2 and Line 3.
Las Adjuntas – transfer station to Caracas Metro Line 2
Alí Primera (formerly: El Tambor)
Guiacaipuro
Independencia
The following stations are under construction:
Los Cerritos – projected completion date set for 2012
Carrizal – projected completion date set for 2012
Las Minas – projected completion date set for 2012
San Antonio – projected completion date set for 2012
This is a light rail line. The following stations are under construction, as part of the project known as the Guarenas / Guatire Metro:
Warairarepano – Point of transfer to line Line 5
Caucaugüita – projected completion date set for 2012
Belén – planned future station
Guarenas I – projected completion date set for 2012
Guarenas II – projected completion date set for 2012
Guatire I – projected completion date set for 2012
Guatire II – projected completion date set for 2012