Neha Patil (Editor)

Line S1, BCR

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type
  
Commuter Maglev

Status
  
Under Construction

Operator(s)
  
Beijing Railway Bureau

System
  
BCR

Termini
  
Shimenying Pingguoyuan

Line length
  
18.869 kilometres (11.725 mi)

Line S1 (Chinese: S1线; pinyin: S Yī Xiàn) or Mentougou Line (Chinese: 门头沟线; pinyin: Méntóugōu Xiàn) formerly known as Datai Line (Chinese: 大台线; pinyin: Dàtái Xiàn), or Beijing Maglev Trains (Chinese: 北京低速磁悬浮; pinyin: Běijīng Dīsù Cíxuánfú) is a magnetic levitation train currently under construction. It will be operated by the Beijing Suburban Railway. Line S1 of BCR will start from the Dinghuiqiao North Number Five Road on the West Fourth Ring Road, and will go west towards Mentougou. The railway is scheduled to be operational sometime in 2017. Once completed, it will be China's 3rd commercial maglev train in operation.

Trains will use the low and middle speed magnetic levitation technology which can give a top speed of 105 kilometers per hour.

A report in February 2013 said all preparatory work was complete and construction would commence "once the National Development and Reform Commission (NDRC) grants its approval."

The line is part of Beijing's attempts to tackle environmental problems caused by heavy car use, coal burning and fast urbanisation. Another reason is that many cities are reportedly upgrading their urban rail systems and introducing green technologies - unlike diesel or coal electric trains do not produce direct emissions.

Six coach maglev trains will be built by the China CNR Corporation, making it the first domestically built Chinese maglev train.

References

Line S1, BCR Wikipedia