Type Aquatic Complex Completed July 17, 2008 Client Mairie du Havre, CODAH Opened 17 July 2008 Architecture firm Jean Nouvel | Location Le Havre, France Cost 16 000 000 € Floor area 12000 m2 Phone +33 2 32 79 29 55 Architect Jean Nouvel | |
![]() | ||
Address Quai de la Réunion, 76600 Le Havre, France Hours Closed now Wednesday10AM–8PMThursday10AM–8PMFriday10AM–10PMSaturday10AM–8PMSunday10AM–8PMMonday10AM–8PMTuesday10AM–8PM Similar Museum of modern art André Ma, St Joseph's Church - Le Havre, Jardins suspendus, Le Volcan, Dock Océane Profiles |
Les bains des docks
Les Bains Des Docks (The Bath by the docks) is an Aquatic Center in the city of Le Havre, France. It was designed by award winning architectural firm Ateliers Jean Nouvel as part of an effort by Le Havre to revitalize its docks and warehouse district.
Contents
Les bains des docks au havre jean nouvel
About
The overall design was inspired by the Roman thermal baths as people can go to congregate in most of the various pools year round. The simple exterior of the building is a precast concrete painted black with a grey base and random windows of varying sizes. Inside there are of over 6 indoor and outdoor pools in different areas including an Olympic sized lap pool and children's play area. Most of the interior consists of straight, boxy designs painted in white with the exception of a children's play area which is multicolored. Several of the indoor pools are at varying levels and waterfalls give a natural division to the different spaces. Large skylights and exterior windows bring in natural light throughout.
The building was featured in the August 2009 issue of Architectural Record