Rahul Sharma (Editor)

Leatherhead railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Leatherhead

Station code
  
LHD

DfT category
  
C2

Number of platforms
  
2

Grid reference
  
TQ163568

Managed by
  
Southern

2011/12
  
2.044 million

Local authority
  
Mole Valley

Leatherhead railway station

Address
  
Leatherhead KT22 7SQ, United Kingdom

Original company
  
London, Brighton and South Coast Railway

Similar
  
Dorking railway station, Ashtead railway station, Epsom railway station, Effingham Junction railway st, Box Hill & Westhumble railway st

Leatherhead railway station is in Surrey, England. It is managed by Southern which provides certain train services and South West Trains provides services to other destinations.

Contents

The long-standing reason for Leatherhead's two train operating companies is that its station is at the junction of the Victoria or London Bridge-terminating Horsham via Dorking Line with the Waterloo-terminating via Epsom route of the New Guildford Line. Both lines are only briefly combined corollaries to the main lines to major towns however were from 1923 until 1996 in the same ownership.

History

The first station in Leatherhead was the terminus of the short-lived Epsom and Leatherhead Railway Company (ELR), opened on 1 February 1859, a company which was bought by the London and South Western Railway.

In 1867 the somewhat winding route from London by Epsom, Dorking, and Horsham to Portsmouth was completed by the London, Brighton and South Coast Railway Company (LBSCR) rendering redundant its running rights over part of the London and South Western Railway line (that is from Epsom to Leatherhead) by jointly acquiring a section of the line, but with a separate station at 'Letherhead'. Leatherhead being due south-south-west from London, both companies, the LSWR and LBSCR, built their own Leatherhead station a few hundred yards apart from each other in the same way as Epsom to the north. The two stations were very close but south of the original junction and joint section of track which as in the present day leads towards Epsom. The first LSWR station was replaced by one 880 yards (805 m) to the near south-west of the LBSCR station, on 2 February 1885 with the opening of the line to Bookham and Effingham Junction and the Guildford New Line from Surbiton via Cobham, linking Leatherhead and Guildford by rail for the first time. It is now demolished and its spur redirected in 1927 (see below).

Under the grouping of 1923, the LBSCR and LSWR became part of (the) Southern Railway and thereby the rivalry of two stations within a few hundred metres made historic. The duplication of stops in the town centre ended in 1927 when the line from Guildford was diverted to join the LBSCR line to the south of the LBSCR station, entailing a new bridge across the River Mole but releasing some land.

The LBSCR station, opened on 1 March 1867 is the one that survives

The stationmaster's house, an integral part of the main building, is boarded up along with the building on platform 2. The LSWR station closed in July 1927, (all trains used the LBSCR station from 10 July) and was used as carriage sidings for many years, this use finally ending in the mid 1970s. The old station fell into greater and greater disrepair, and the old line was finally removed in the 1980s. All that remains are part of the steps up from road level to platform level.

The line through Leatherhead was electrified in 1925, third rail services starting between Waterloo and Dorking (North)/Bookham and the Guildford New Line on 12 July.

In the 1930s, it was planned to extend the new line to Chessington to Leatherhead. However, World War II caused this to be put on hold, and a subsequent protection order on Ashtead Common meant that this was never built. The land reserved through North Leatherhead for the railway has become part of the course of the M25 motorway.

Ticket barriers were installed in 2011.

Architecture

The present station is a grade II (starting category) listed building featuring a square tower above what was the station master's house on the northern projection and along its long central range "an arcade of brick piers [arch supports] with moulded stone imposts and round-headed arches, each under a 2-centred extrados and hoodmould, that at the left end with the doorway to the booking hall and the others with sashed windows, and the whole under a very prominent horizontal canopy with a [wavy white metalwork fascia] supported by slender iron columns with ornamental brackets" The tower is red bricked and white stone-dressed. It is in the details of the dressings italianate particularly its bulged cornice and pyramidal (steep hipped) roof.

Services

Leatherhead station is served by both Southern and South West Trains.

The typical off-peak service pattern in trains per hour is as follows:

Southern

  • 2tph to London Victoria via Sutton
  • 2tph to Dorking with one carrying on to Horsham
  • South West Trains

  • 4tph to London Waterloo via Wimbledon
  • 2tph to Dorking
  • 2tph to Guildford
  • Most Southern services terminate at Dorking after 20.00 on weekdays and there is no Saturday evening or Sunday service south of there.

    Bus services

    London Buses route 465 serves the station and Surrey County Council provide a list of bus services grouped under 'Dorking, Leatherhead, Epsom and Banstead bus timetables'.

    References

    Leatherhead railway station Wikipedia


    Similar Topics