Lai Châu Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Vietnam

Status
  
Under construction

Impounds
  
Da River

Province
  
Lai Châu Province

Construction cost
  
1.8 billion USD

Impound
  
Black River

Location
  
Lai Châu Province

Opening date
  
2017 est.

Operator(s)
  
EVN

Phone
  
+84 129 344 3008

Construction began
  
2011

Lai Châu Dam

Address
  
Nậm Hàng, Mường Tè, Lai Chau, Vietnam

Hours
  
Open today · Open 24 hoursSaturdayOpen 24 hoursSundayOpen 24 hoursMondayOpen 24 hoursTuesdayOpen 24 hoursWednesdayOpen 24 hoursThursdayOpen 24 hoursFridayOpen 24 hours

Similar
  
Sơn La Dam, Hòa Bình Dam, Trung Sơn Dam, Yali Falls Dam, Đa Nhim Hydroelectric Power St

The Lai Châu Dam is a hydroelectric dam on the Black River under-construction in Nậm Hàng commune, Mường Tè District, Vietnam. Construction started on 5 January 2011 and it is expected to be operational by 2017 with the first turbine put into operation in 2016. The ground clearance works and relocation of people was completed by September 2010. The owner of the power station is Vietnam Electricity.
Dam was designed by Hydroproject, a Russian hydrotechnical design firm. The power station will have three Francis turbines with a capacity of 400 MW each. Turbines will be manufactured at the Alstom's plant in Tianjin, China. The total capacity of the station will be 1,200 MW. When constructed, it will be the third largest hydroelectric power station in Vietnam. It is expected to cost US$1.8 billion.

References

Lai Châu Dam Wikipedia